BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and paving for a mixed-use development in Darien, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 19, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Pear Tree Beach Park Improvements Project:- The scope of work includes construction of site improvements but is not limited to new parking lot, concrete curbing, concrete sidewalks, concrete paving, stormwater infrastructure, landscaping, site furniture, dredging, wetland restoration, and other beach improvements within the Pear Tree Beach Park on Pear Tree Point Road in the Town of Darien, Connecticut. The Owner wishes to commence work on or about November 3, 2025, and complete all work by May 1, 2026. Question Deadline 07/28/2025 All questions by prospective bidders as to the interpretations of the Advertisement for Bids, Form of General Bid, Agreement, Drawings, Specifications or Bonds, must be submitted in writing to the Project Engineer, Weston & Sampson Engineers, Inc., via email: BiggsD@wseinc.com, at least ten (10) days before the date herein set for the opening of bids. Bid(5%), Performance(100%), Payment(100%), Certified Check *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$7,997,400.00

Public - City

Paving, Site Work

16

20

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,031
Active Projects
469
Bidding Soon
6,064
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

November 10, 2025

Project location map

139 Pear Tree Point Rd, Darien, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.