BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work and paving for a mixed-use development in Clayton, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Scope of Work consists of a variable depth removal of the existing asphalt surface in order to correct the crown in the roadway, followed by replacement with a new 2 asphalt overlay for approximately 1.01 miles of roadway and the addition of concrete paver crosswalks. Replacement of underlying concrete slabs may be necessary in isolated locations as conditions require. Existing curb ramps will be replaced in order to bring them into ADA compliance and select signal detector loops will require replacement. Striping, traffic control, and other items shall be included as shown in the specifications All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2024 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid in accordance with the Bidders Checklist. The City of Clayton reserves the right to accept or reject any bid and the waive any irregularities in the best interest of the City. The DBE goal for this project is 7% MODOT - Clayton CBD Resurfacing - Phase 2 All questions concerning the bid document preparation can be directed to Richard Wilburn, Principal Civil Engineer, at 314-290-8540. Project specific questions can be directed to Brady Jordan, Sr. Principal Engineer, Horner & Shifrin at 314-335-8661. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$1,898,638.00

Public - City

Paving, Site Work

45

7

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
113
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

September 1, 2025

Project location map

To Be Determined, Clayton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.