Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 28, 2025 at 8:00 PM
Updated October 29, 2025
Site work for a civil project in Saint Augustine Beach, Florida. Completed plans call for site work for a water / sewer project.
Construction of improvements to the seawall of Avenida Menendez, located south of Bridge of Lions and east of the intersection with Marine Street in St. Augustine, Florida 32084. Avenida Menendez Seawall Rehabilitation Design is provided in Exhibit A. The Seawall Mitigation portion of the project (precast sheet piles with concrete cap, see COST SCHEDULE under Mitigation, lines 2 and 3) shall be completed no later than September 30, 2025 in accordance with the Florida Inland Navigation District (FIND) grant #SJ-SA-22-214, Exhibits F through H. Project in its entirety shall be completed no later than December 31, 2026. This project is currently funded through FEMA's Hazard Mitigation Grant Program and therefore subject to federal requirements. Each Response must be accompanied by a Bid/Proposal/Letter of Intrest guaranty in the form of a Bid/Proposal/Letter of Intrest bond or cashier's check, payable to the City, for five percent (5%) of the "Total Cost" indicated on the Solicitation. Cash will not be accepted. The Bid/Proposal/Letter of Intrest bond must be written through a licensed Florida agency with a company licensed to do business in the State of Florida and meeting the requirements of the Agreement. The guarantee must provide that the Response will remain firm for sixty (60) days after the designated date and hour of the Solicitation opening; that if the Response is accepted, Respondent must enter into a contract with the City in accordance with the Agreement; and that Respondent will provide any required performance and payment bonds and certificates of insurance. Question Deadline 08/31/2025 at 5:00 PM ET Danielle Falkner, NIGP-CPP, CPPB (904) 209-4316 dfalkner@citystaug.com The City prefers ALL inquiries related to this solicitation to be submitted through the Question and Answer section of the Project through online. Question Response Deadline:August 5, 2025, 5:00p The City of St. Augustine is seeking the services of a qualified and licensed Florida contractor for construction of improvements to the seawall of Avenida Menendez, located south of Bridge of Lions and east of the intersection with Marine Street in St. Augustine, Florida 32084. Avenida Menendez Seawall Rehabilitation Design is provided in Exhibit A. Precast sheet piles with concrete cap (see COST SCHEDULE under Mitigation, lines 2 and 3) are the priority of this project and as such needs to be completed first and expeditiously. The City is committed to completing this project financially. Construction is estimated for one hundred eighty (180) days, barring unforseen delays. Project in its entirety shall be completed no later than December 31, 2026. This project is currently funded through FEMA's Hazard Mitigation Grant Program and therefore subject to federal requirements. The construction scope of work shall include elevating and reinforcing a portion of the eastern seawall on the Matanzas River with the installation of approximately 180 linear feet of new concrete seawall in front of the existing riverfront seawall. The existing seawall cap elevation is approximately 5.0 feet (NAVD88). This cap shall be demolished for construction activities. The new seawall cap shall tie the existing wall to the proposed project and shall be constructed to an elevation of 7.1 feet (NAVD88) top of wall. The proposed concrete sheet pile elevations are from +6.1 feet to -22.0 feet with the wall cap reinforcing the top and seaward portions. Additionally, two existing 12-inch diameter polyvinyl chloride (PVC) stormwater outfall pipes shall be retrofitted with 12-inch Ultraflex Checkmate check valves, or an appropriate product determined by the engineer, to adequately protect the infrastructure. Riprap protection is proposed in areas of the seawall hardening and isidentified along both the wall improvement length and outfall protection locations. Appropriate transition back to the existing grades are included as well as aluminum railing to return the area to operational conditions. The City of St. Augustine Marina requests that access be maintained for its South Dock as that is an active working dock with customers that will need to have access throughout the duration of the project. Fuel deliveries are scheduled for the fuel pad. The Contractor shall coordinate directly with the Marina (Harbormaster) on accommodating these deliveries. To comply with the City of St. Augustine Historical Architectural Review Board, Coquina panels are identified as a facade to the seawall. This project shall provide a higher level of protection from direct storm surge flooding during storm events. This area of the seawall is identified as a low point and the area has experienced past flood damage. The project shall be constructed to provide protection against a 100-year storm event. Activities shall be completed in strict compliance with Federal, State and Local applicable Rules and Regulations. This project is subject to archaeological monitoring in accordance with the archaeological monitoring requirements provided in Exhibit B The City hasretained an archaeologist that will be on site during ground disturbing activities to monitor the project during construction. Should any evidence of historic or prehistoric resources be discovered during ground-disturbing activities, all work within proximity of the discovery should stop to allow for proper assessment, recording and recovery of the cultural deposits in a professional manner. Additionally, should any suspicious materials, prehistoric or historic artifacts, or suspected bones or other indications of human remains be encountered during subsurface excavation, all work in that area will be stopped and moved to another area until the location can be inspected. Artifacts could include prehistoric pottery, concentrations ofshell, bone, and dark soilstainsthat feel "greasy." Should these things be encountered, we will request that the operator STOP digging at that location. For burials, the discovery must be reported to City of St. Augustine and local law enforcement, who will in turn contact the medical examiner if the Applicants Archaeologist (Contractor) is unable to determine if the burial is prehistoric. The medical examiner will determine whether or not the State Archaeologist should be contacted per the requirements of Chapter 872.05, Florida Statutes. Representatives of the Contractor will assist in the identification and preliminary assessment of the materials or turn these duties over to the City as requested. The time limit for completing the work authorized ends on March 14, 2026 Bid Results : General TIC- The Industrial Company $219,390.00 Mitigation BDI marine and sitework $1,355,116.80 Rehabilitation TIC - The Industrial Company $11,140.00
Award
Water / Sewer
$1,873,002.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2025
October 9, 2025
Avenida Menendez, Saint Augustine Beach, FL
Related To This Project
Saint Augustine Beach, FL
Bid Date: Jul 18 2025
Saint Augustine Beach, FL
Bid Date: Aug 13 2025
Saint Augustine Beach, FL
Bid Date: Aug 27 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Jul 23 2025
Saint Augustine Beach, FL
Bid Date: Jul 28 2025
Saint Augustine Beach, FL
Bid Date: Jul 31 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Jul 30 2025
Saint Augustine Beach, FL
Bid Date: Aug 21 2025
Saint Augustine Beach, FL
Bid Date: Jul 11 2025
Saint Augustine Beach, FL
Bid Date: Jul 02 2025
Saint Augustine Beach, FL
Bid Date: Jul 14 2025
Saint Augustine Beach, FL
Bid Date: Aug 23 2018
Saint Augustine Beach, FL
Bid Date: Apr 24 2019
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
