BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a water / sewer project in Harriman, Tennessee. Completed plans call for site work for a water / sewer project.

The Owner reserves the right to reject any or all bids and to waive any informalities or technicalities therein. No technical questions will be taken after 3:00 PM July 18, 2025. The work to be done consists generally of: Contract 3: the installation of approximately 23,100 feet of 8 and 12-inch water lines including all appurtenances as shown on the drawings and described in the specifications. Each bid shall be accompanied by a Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Tennessee, in the amount of five percent of the total bid price, as a guarantee that if the bid is accepted, the Bidder will enter into a con-'tract and execute the Performance and Payment Bonds in the form and within the time specified. The successful Bidder will be required to execute a Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract, issued by a Surety Company licensed to operate in the State and shall be named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. Each Bidder shall be a licensed Contractor as required by the regulations of the State of Tennessee General Assembly's Contractor's Licensing Act of 1976, and all amendments thereto in effect on bid receipt date. License number, expiration date, and license classification shall be shown on the outside of the envelope containing the bid of the General Contractor. The license number, expiration date, and license classification shall also be shown for the electrical subcontractor, plumbing subcontractor, and mechanical subcontractor. Failure to show these items on the outside of the envelope will result in bid being returned to Bidder unopened. Each Bidder shall be in compliance with the Iran Divestment Act and certifies that it is not currently engaged in, and covenants that it will not, for the duration of the Contract, engage in a Boycott of Israel, as that term is defined in Tenn. Code Ann. 12-4-127. The successful Bidder shall provide certification of compliance with these acts with their bid. This project is being supported with American Rescue Plan Act, Coronavirus State and Local Recovery Fund grant funding. Therefore, certain restrictions and other federal requirements attach to this opportunity. The Harriman Utility Board hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The Harriman Utility Board is an Equal Opportunity Employer. Any contract that uses federal funds to pay for construction work is a "federally assisted construction contract" and must include the equal opportunity clause found in 2 C.F.R. Part 200, unless otherwise stated in 41 C.F.R. Part 60. We encourage all small and minority owned firms and women's business enterprises to participate. A detailed listing of all subcontractors shall be provided by the Bidder. In accordance with the Contract Documents, documentation that the prospective General Contractor and its subcontractors meet minimum qualifications shall be provided and submitted. Mark-ups on subcontractor work or Cost Plus Overhead will be disallowed for reimbursement. Bidders must agree to comply with the Prevailing Wage Rate provisions per the Federal Davis-Bacon Act. The Copeland Anti-Kickback Act is also applicable, which prohibits workers on construction contracts from giving up wages that they are owed. Contractors must not appear on Sam.gov disbarment list. No Bidder may withdraw his bid for a period of sixty (60) days after the date of actual bid opening, without Owner's consent.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

18

23

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
60
Bidding Soon
918
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

Multiple Locations, Harriman, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.