BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a manufacturing facility in Leduc, Alberta. Completed plans call for the renovation of a manufacturing facility.

The purpose of this RFP is to secure a reliable and competent Contractor(s) to provide installation services of an Evaporator on purchased equipment at the Agrivalue Processing Business Incubator (APBI) at Leduc, AB. a) Project Background- Two years ago an evaporator was removed from Suite F at our Agrivalue Process Business Incubator (APBI) to accommodate the installation of a spray dryer. Since the evaporator was removed, it was used (repurposed) in a space (Suite B) occupied by a tenant who needed additional cooling capacity. This left Suite F short on refrigeration capacity. We also have a larger evaporator on site that was removed for the same reason, to accommodate the installation of a spray dryer. That unit is not going back to its original location, so we would like to used it in Suite F, where we know our refrigeration capacity has been reduced. b) Project Objectives-The installation of this evaporator will allow us to restore the full refrigeration capacity of Suite F, which will be leased to a private sector client July 23rd. Since the evaporator has a slightly larger capacity it will have a bonus benefit of having additional cooling capacity, which is always a bonus for our tenants. c) Project Structure/ Business model- The vendor is responsible for the full scope of work, including engineering, planning, installation commissioning and tie ins to the facility BMCS, but not programming. Programming will be completed by the local operator (BGIS). d) Key Stakeholders- The project is to satisfy the need of a client of Agriculture and Irrigation. However, although the project is being managed by Agriculture and Irrigation, the project coordination will involve; Tenant occupying the space, BGIS as a facility TPM and Alberta Infrastructure if necessary. This has already been communicated. e) Related Project Documents- Attached, is the mechanical blueprint of the existing system for the space occupied, including the entire "Suite". The evaporator, although larger, will be easy to secure in the same space which was occupied by the smaller unit, removed two years ago. f) Miscellaneous- All regulatory requirements including safe operating procedures with respect to ammonia, ammonia release and handling procedures are to be followed. It is the vendors responsibility to provide a detailed hazard assessment to the proponent which will be shared with all stakeholders.

Post-Bid

Manufacturing

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
22
Bidding Soon
640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

July 28, 2025

Project location map

6309 45 St, Leduc, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.