BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Renovation of a fitness / recreation center in Union City, California. Working plans call for the renovation of a fitness / recreation center.

**As of August 18, 2025, the project is suspended. No definite date for the rebid.** The Contractor shall possess a Class B or C-20 (Warm-Air Heating, Ventilating and Air Conditioning) California contractor's license. Bids are required for the entire work described herein. This contract is subject to the State contract non discrimination and compliance requirements pursuant to Government Code Section 12990. Two rooftop air conditioning units serving the gymnasium are currently non-functional. Based on diagnostic assessment, full replacement is required to restore proper cooling, ventilation, and heating to the space. The scope of work includes removal of existing rooftop units and associated equipment, procurement and installation of new packaged rooftop air conditioning units, and all necessary mechanical, electrical and control work to ensure complete and functional system integration. Minimum wage rates for this project as predetermined by the Secretary of Labor are set forth in the special provisions. If there is a difference between the minimum wage rates predetermined by Secretary of Labor and prevailing wage rates determined by the Department of Industrial Relations for similar classifications of labor, the contractor and his subcontractors shall pay not less than the higher wage rates. Pursuant to Section 1773 of the Labor Code, the general prevailing rate of wages in the county in which the work is to be done has been determined by the Director of the wage rates appear in the Department of Transportation publication entitled General Prevailing Wage Rates, (current semi annual which have been predetermined and are on file with the Department of Industrial Relations are referenced but not printed in said publication. It also provides an opportunity for those who missed the first visit to view the site conditions, existing rooftop air conditioning units, and surrounding context relevant to the replacement project.

Final Planning

Fitness / Rec Centers

$140,000.00

Public - City

Renovation

6

8

9

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
218
Bidding Soon
3,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

February 18, 2026

Project location map

31224 Union City Blvd, Union City, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.