BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Renovation of a water / sewer project in Mount Vernon, Ohio. Working plans call for the renovation of a water / sewer project.

As of September 2, 2025, the owner has determined a list of pre-qualified construction manager. The City of Mount Vernon (Owner) will be requesting Statements of Qualifications from the Construction Manager at Risk (CMAR) organizations (Proposers) for the construction of the following Project, and for related pre-construction and procurement CMAR services: Mount Vernon WWTP Phosphorus and Solids Improvements Owner will receive printed Statements of Qualifications demonstrating the Proposer's qualifications and ability to provide CMAR services and construct the Project at the Mount Vernon Wastewater Treatment Plant located at 3 Cougar Drive Mount Vernon, OH 43050. Owner anticipates that the CMAR's Contract Price will be approximately $45 million. The CMAR Contract has an expected start date of November 2025 for Preconstruction Services and September 2026 for Construction services. Construction has an expected duration of 640 days. The meeting will be held at City Hall with an optional site walk of the wastewater treatment plant afterwards. Attendance at the Information Conference is required for companies intending to respond to the RFQ. Two-Step Process Selection of the Construction Manager will be made using a two-step process. Step One: Owner will receive Statements of Qualification and evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Question Deadline 08/01/2025 at 4:00 PM ET All questions concerning this RFQ shall be directed in writing via email to Daniel Gernant with Arcadis at daniel.gernant@arcadis.com Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner's consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for the award of the CMAR Contract. Details regarding the selection criteria and the selection process are included in the Request for Qualifications. Proposal Documents Details regarding the selection criteria and the selection process are included in the Request for Qualifications. Refer to the Proposal Documents for all further requirements regarding Statements of Qualifications, Proposals, CMAR selection, and other Proposal submittals, qualifications, and procedures.

Final Planning

Water / Sewer

$45,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
137
Bidding Soon
2,464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

September 1, 2026

Project location map

3 Cougar Dr, Mount Vernon, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.