Site work and paving for a road / highway in Frisco, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Region: 1 Counties: Clear Creek, Summit It is estimated that the total cost of all items in the bid will be: (X) Between $1,000,000 and $5,000,000 Contract UDBE Goal: 0.00 % Guaranty: 5% of Total Bid Work Days: 25 I-70 Eisenhower-johnson Memorial Tunnel, Right Lane Overlay and Striping, Mm 213.5 to Mm 215.7 This project is located in Region 1 in Clear Creek and Summit Counties. Project work consists of overlay and striping the right lane of I-70 from MM 213.5 to MM 215.7 in the Eisenhower-Johnson Memorial Tunnel. Please contact Jeff Hampton at 303-501-3695 for all project related questions. CODOT: 001 - Region 1- I-70 Eisenhower Johnson Memorial Tunnel Overlay and Striping *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 38162 All questions shall be directed to the CDOT contacts listed above no later than of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week. Questions and answers shall be used for reference only and shall not be considered part of the Contract. This work consists of the removal and replacement of loop detector wires, or loops for the Automatic Traffic Recorder (ATR), where the loops have been removed within a project site. Work shall be in accordance with this specification and as shown on the plans. QA: CDOT Maintenance have made themselves available to manage traffic control operations for this project. They will be able to set up the full bore closures and direct traffic in alternating queues through the opposite bore each night of work. The bid items related to traffic control on the bid quantities are included in order to provide contingency in the event that M&O has a situation or irregular operation scenario come up that would prevent them from performing the traffic control on a particular night The striping quantities detailed in the SAQ table and on the bid proposal schedule will be for permanent striping only. Temporary striping will not be necessary or required of the contractor on this project
Award
Roads / Highways
$2,769,130.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
September 22, 2025
I-70, Frisco, CO
Related To This Project
Frisco, CO
Bid Date: Aug 22 2025
Frisco, CO
Bid Date: Jul 31 2025
Frisco, CO
Bid Date: Aug 26 2025
Frisco, CO
--
Frisco, CO
Bid Date: Sep 26 2025
Frisco, CO
Bid Date: Nov 13 2025
Frisco, CO
Bid Date: Nov 05 2025
Frisco, CO
--
Frisco, CO
Bid Date: Aug 08 2025
Frisco, CO
--
Frisco, CO
Bid Date: Jun 04 2025
Frisco, CO
Bid Date: Jun 04 2025
Frisco, CO
Bid Date: Jun 04 2025
Frisco, CO
--
Frisco, CO
Bid Date: May 20 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.