BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Site work and paving for a road / highway in Frisco, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Region: 1 Counties: Clear Creek, Summit It is estimated that the total cost of all items in the bid will be: (X) Between $1,000,000 and $5,000,000 Contract UDBE Goal: 0.00 % Guaranty: 5% of Total Bid Work Days: 25 I-70 Eisenhower-johnson Memorial Tunnel, Right Lane Overlay and Striping, Mm 213.5 to Mm 215.7 This project is located in Region 1 in Clear Creek and Summit Counties. Project work consists of overlay and striping the right lane of I-70 from MM 213.5 to MM 215.7 in the Eisenhower-Johnson Memorial Tunnel. Please contact Jeff Hampton at 303-501-3695 for all project related questions. CODOT: 001 - Region 1- I-70 Eisenhower Johnson Memorial Tunnel Overlay and Striping *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 38162 All questions shall be directed to the CDOT contacts listed above no later than of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week. Questions and answers shall be used for reference only and shall not be considered part of the Contract. This work consists of the removal and replacement of loop detector wires, or loops for the Automatic Traffic Recorder (ATR), where the loops have been removed within a project site. Work shall be in accordance with this specification and as shown on the plans. QA: CDOT Maintenance have made themselves available to manage traffic control operations for this project. They will be able to set up the full bore closures and direct traffic in alternating queues through the opposite bore each night of work. The bid items related to traffic control on the bid quantities are included in order to provide contingency in the event that M&O has a situation or irregular operation scenario come up that would prevent them from performing the traffic control on a particular night The striping quantities detailed in the SAQ table and on the bid proposal schedule will be for permanent striping only. Temporary striping will not be necessary or required of the contractor on this project

Award

Roads / Highways

$2,769,130.00

Public - State/Provincial

Paving, Site Work

131

5

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
99
Bidding Soon
1,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

September 22, 2025

Project location map

I-70, Frisco, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.