Site work and paving for a mixed-use development in Plano, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project No: 2413.041 The City of Plano is soliciting construction of a project including the removal and replacement of approximately 12,148 linear feet of 6 and 8 waterlines, associated concrete pavement replacement, and barrier free ramps along the following streets: Los Robles Drive between Los Rios Blvd and San Miguel Drive (Approx. 1,153 LF), San Miguel Drive (Approx. 1,338 LF), Country Club Drive between Los Robles and Los Rios Blvd (Approx. 3,173 LF), Aliso Road between Los Robles Drive and Fresno Road. (Approx. 1,653 LF), San Saba Court (Approx. 408 LF), Rosita Court (Approx. 380 LF), Ranch Estates Drive between San Gabriel Drive and Merriman Lane (Approx. 3,632 LF), and Ranch Estates Circle (Approx. 411 LF). Questions must be submitted electronically through online at planotx.ionwave.net. No questions will be answered over the phone or through email. Time Critical Bid/Proposal Deliveries: The City of Plano cannot guarantee, due to internal procedures, that any bids/proposals sent via US mail will be picked up and delivered by the closing date and time. It is recommended that critical bid/proposal deliveries be made either electronically through IonWave or in person as described above. It is further recommended that users review all electronic response attachments to ensure the uploaded files are able to be downloaded and viewed. Instructions for this, if needed, can be found in the Supplier Bid Response Quick Tutorial online in or by calling Support at 844-226-3862. Responses or parts of a response whether hardcopy or electronic that cannot be viewed may deem your submittal as non-responsive. In addition, the City reserves the right to request clarification in such cases. Bid Bonds or cashier's checks may be submitted by uploading a scanned copy into online . The apparent low bidder will be required to furnish the original bid bond or cashiers check within 24 hours of the request by the Procurement Department or may be deemed non-responsive. Question Deadline 07/25/2025 at 2:00 PM CT Submit all questions on the solicitations question portal via Electronically. Answers will be provided via the IonWave interface or addenda To attend the non-mandatory pre-bid meeting, access the Teams Teleconference via the information below, date and time can be found on the Activities tab for this RFB on PlanoTX.IonWave.net. Microsoft Teams Meeting ID: 225 949 735 772 2 Passcode: nY3dZ3ze or Dial in by phone 1-469-998-7570 Phone conference ID: 296 186 535# The owner will provide rights-of-way for the purpose of construction without cost to the CONTRACTOR, by securing permits in areas of public dedication or by obtaining easements across privately owned property. It shall be the responsibility of the CONTRACTOR, prior to the initiation of construction on easements through private property, to inform the property owner of this intent to begin construction. Before beginning construction in areas of public dedication, the CONTRACTOR shall inform the agency having jurisdiction in the area forty-eight (48) hours prior to initiation of the work. If a building permit is needed, it is provided at no cost; the contractor must register with the City and is responsible for all associated fees The successful bidder must furnish a performance bond, on the form provided, in the amount of one hundred fifteen percent (115) of the contract price. Successful bidder must also provide a material and labor payment bond, on the form provided, in the amount of one hundred percent (100) of the contract price. Bonds must be from an approved surety company holding a permit from the State of Texas to act as surety, or other sureties acceptable to the Owner. Delivery of applicable bonds to the City no later than ten (10) days after notice of award is required. Identify, as a part of your response, the time needed to reach substantial completion and then final completion. This sum should equal the total days allowed as stated in the Contract Time section of the Overview. JOb no: 2413.041

Bid Results

Water / Sewer

$3,947,461.00

Public - City

Paving, Site Work

50

15

2

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
5
Bidding Soon
2,600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

October 13, 2025

Project location map

Multiple Locations, Plano, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.