Remodeling of a stadium in Stillwater, Oklahoma. Completed plans call for the remodel of a stadium.
OSU Boone Pickens Stadium West Endzone Bench Question Deadline 07/24/2025 Please contact Jeff Blose (jhblose@flintco.com) or Kyle Rhine (kyle.rhine@flintco.com) with Flintco at (918) 710-3277 with any questions about bid procedures or documents The scope of work for ALL bid packages shall include, but is not necessarily limited to, the following general items: Project Coordination: 1.) Contractor is to furnish manpower, materials, and equipment necessary, as required by the project schedule, including interim milestone dates, and to furnish additional crews, equipment, etc. and/or overtime required to maintain the schedule if Contractor falls behind due to their own fault or due to inclement weather. 2.) Contractor is responsible for field engineering, layout and field layout from benchmarks and base building control furnished by the Construction Manager. The Construction Manager shall provide one horizontal and one vertical control point and transfer of this point is the responsibility of the contractor. Rough-In requirements are to be dimensioned off of column lines as shown on the contract documents. 3.) Contractor shall furnish hoisting, material transport, and all material handling for the scope of this bid package. 4.) Contractor shall furnish pumping and dewatering as required for the scope of this bid package. Any performed must be done so as not to hinder any other tradesí work. 5.) Contractor will perform any saw cutting, patching, and removal of debris as required for the scope of this bid package. The Construction Manager must approve the quality of any cutting and patching work. 6.) Contractor shall furnish drinking water for its employees and its subcontractorsí employees for the scope of this bid package. 7.) Contractor shall include all remobilization operations required to complete the scope of this bid package. 8.) Contractor shall include temporary power for the scope of their work until building temporary power is provided. 9.) Contractor shall coordinate all material deliveries with the Construction Manager and shall have a representative on site to receive all deliveries of materials under the scope of work of this bid package. 10.) Contractor shall clean up his work in such a manner as to maintain safe working conditions on the project
Post-Bid
Arenas / Stadiums
$250,000.00
Public - State/Provincial
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
September 15, 2025
700 W Hall of Fame Ave, Stillwater, OK
Related To This Project
Stillwater, OK
Bid Date: Aug 27 2025
Stillwater, OK
Bid Date: Jul 28 2025
Stillwater, OK
Bid Date: Oct 15 2025
Stillwater, OK
Bid Date: Aug 13 2025
Stillwater, OK
Bid Date: Aug 08 2025
Stillwater, OK
Bid Date: Sep 08 2025
Stillwater, OK
Bid Date: Sep 16 2025
Stillwater, OK
Bid Date: Jul 28 2025
Stillwater, OK
Bid Date: Jul 16 2025
Stillwater, OK
Bid Date: Jul 09 2025
Stillwater, OK
Bid Date: Jul 02 2025
Stillwater, OK
Bid Date: Jul 09 2025
Stillwater, OK
Bid Date: Jun 25 2025
Stillwater, OK
Bid Date: Jun 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.