Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and paving for a road / highway in Naples, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of September 24, 2025 Bid were rejected . No definite date for rebid Banyan Blvd Restoration The City of Naples is an equal opportunity employer. Question Deadline 08/02/2025 Direct all questions to: Felix Gomez, CPPB, NIGP-CPP, MSM Procurement and Contracts Manager City of Naples, Purchasing Division 735 8th Street South Naples, Florida 34102 PH: (239) 213-7101 FX: (239) 213-7105 Fgomez@naplesgov.com Provide all labor, materials, equipment and incidents required to prepare the site to final grade, install irrigation, landscape trees/palms, and plants in accordance with the plans and as specified. These specifications are inclusive of a required guarantee, replacements, clean-up, and maintenance of traffic, all of which shall be included in the unit bid price for each project. 1. 2. 3. 4. B. All work shall be performed by personnel familiar with installation of irrigation and plants/trees and maintenance of traffic procedures and under the supervision of a qualified foreman, who shall be on-site at all times during the work. Finish Grade: The Contractor shall verify with the City that the final grade has been achieved and shall perform fine grading if so, directed by the City. The Contractor is responsible for any trees or palms that are planted prior to achieving final grade. Prior to commencing work, the Contractor shall visit the site and ascertain all site conditions, including utilities, structures, slopes, access and available workspace to preclude any misunderstandings and to ensure a trouble-free installation. It shall be the Contractor's responsibility to avoid conflicts with existing underground and overhead utilities and structures. The Contractor shall examine available utility plans and notify the City of any conflicts and needed adjustments. The Contractor shall notify all utilities servicing the work area at least 48 hours prior to any excavation so that underground utilities may be located. The contractor has the responsibility to contact Sunshine State One-Call of Florida, Inc. at 1-800-432-7700 to schedule marking locations of the utilities which subscribe to their service. Prior to preparation, the Contractor shall ascertain the on-site location of, and take necessary precautions to avoid damage to, all above ground and underground utilities, under drain trenches, electrical cables, conduits, utility lines, oil tanks, supply lines, pavement, curbing, traffic control devices, pedestrian signals, building structures, or waterproofing. The Contractor shall be responsible for the cost of repairing all damage. The Contractor shall properly maintain and protect all such improvements. APPLICABLE DOCUMENTS Plant nomenclature shal conform to the names given in "The New Royal Horticultural Society Dictionary of Gardening", which is the source cited by the current 2015 edition of Florida Grades and Standards for Nursery Plants, by the Florida Department of Agriculture and Consumer Services, Division of Plant Industry (henceforth called Florida Grades and Standards). a. b. 2. Names and varieties not included therein shall conform generally with names accepted in the nursery trade. Substitution will be permitted only upon submission of proof that any specified plant is not obtainable or suitable for the location as specified on the plan and upon written authorization of the City. The Contractor is obligated to be familiar with and understand the following documents in order to comply with the requirements therein to properly perform the work contemplated in this contract: a. b. c. d. e. f. g. C. All plans and documents within the bid package set. The Florida Grades and Standards (current edition). The Florida Department of Transportation Standard Specifications for Road and Bridge Construction, (current edition - as general operating specification document, excluding Section 580, landscaping). The Florida Department of Transportation, Roadway and Traffic Design Standards, (current edition). The Manual of Uniform Traffic Control Devices for Streets and Highways, by the federal Highway Administration, (current edition). The State of Florida Manual on Traffic Control and Safe Practices. (current edition). The Manual of Uniform Minimum Standards for Design, Construction, and Maintenance of Streets and Highways, by F.D.O.T. (current edition).

Final Planning

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

24

3

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
61
Bidding Soon
591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

March 24, 2026

Project location map

Banyan Blvd, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.