Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Site work and paving for a road / highway in Oak Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
In general, the improvements consist of: the installation of pavement markings including polyurea, Methyl Methacrylate (MMA), and thermoplastic; the fabrication and installation of signs and telescoping steel sign supports and all appurtenant work thereto. The Village of Oak Park reserves the right to issue plans and specifications only to those contractors deemed qualified. All prospective bidders must prove they are pre-qualified by the Illinois Department of Transportation by uploading a certificate of eligibility when submitting their bid This work shall consist of furnishing and installing Flexible Delineators on asphalt. This work shall consist of furnishing and installing a Custom sign panel as shown in the plans in accordance with Section 720 and 728 of the Standard Specifications at locations specified by the engineer. This work shall consist of furnishing and installing telescoping steel sign supports for ground mounted signs utilizing a telescoping base section in accordance with Section 728 of the Standard Specifications and as revised or amended in this special provision. This work shall consist of the removal and salvage existing sign panels show on the plans to be removed. The sign plans shall be returned to the Village once removed. It the post the sign was on is not being used for another sign the post shall be removed as well as part of this work. This work shall consist of furnishing and installing the Rectangular Rapid Flashing Beacon (RRFB) Assembly complete with dual sided RRFB; power supply; controller and cabinet, wireless communication equipment, traffic signal post, foundation, conduits, cables, and pedestrian push-buttons and signing as shown on the plans and/or as specified by the Engineer. This work shall consist of furnishing and installing TreeTop Premium Rubber Speed Bumps on existing pavement at the locations shown on the plans.
Award
Roads / Highways
$809,902.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
Multiple Locations, Oak Park, IL
Related To This Project
Oak Park, IL
--
Oak Park, IL
Bid Date: Sep 17 2025
Oak Park, IL
Bid Date: Oct 09 2025
Oak Park, IL
Bid Date: Oct 24 2025
Oak Park, IL
--
Oak Park, IL
Bid Date: Oct 29 2025
Oak Park, IL
Bid Date: Oct 30 2025
Oak Park, IL
Bid Date: Aug 28 2025
Oak Park, IL
Bid Date: Jul 25 2025
Oak Park, IL
Bid Date: Jul 21 2025
Oak Park, IL
--
Oak Park, IL
Bid Date: Jul 09 2025
Oak Park, IL
Bid Date: Jul 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
