BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Site work and paving for a mixed-use development in Dewitt, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 13, 2025, project was awarded to Michigan Paving & Materials Co, awarded amount is $5,092,712.15. Airport Rd from Grand River to Herbison Rehabilitation Contact information Contact name: Alison Swain Contact phone: 9896680040 Contact email: swaina@ccrc-roads.com 3.7 miles of widening for paved shoulders and center left-turn lane and auxiliary right turn lane, with HMA resurfacing, along with traffic signal construction (2 locations), grading and drainage improvements, cold milling, asphalt stabilized base, intermittent concrete curb and gutter, aggregate shoulders, restoration, and signing/pavement marking in Watertown and Dewitt Townships and the City of Lansing, Clinton County. The Clinton County Road Commission (CCRC) is soliciting proposals for the Airport Road Rehabilitation project. Major items of work include 20,500 tons of HMA Pavement, 68,000 square yards of Asphalt Stabilized Base, 183 stations of Machine Grading, traffic signals, and culvert & storm sewer installation, and all related work. The Clinton County Road Commission (CCRC) is soliciting proposals for the Airport Road Rehabilitation project. Major items of work include 20,500 tons of HMA Pavement, 68,000 square yards of Asphalt Stabilized Base, 183 stations of Machine Grading, traffic signals, and culvert & storm sewer installation, and all related work. The Engineer anticipates that construction can begin no earlier than 10 calendar days after award or as directed by the Engineer. In no case shall any work be commenced prior to receipt of formal notice of award by the Owner. The Contractor shall prepare and submit a complete, detailed, signed Progress Schedule to the Engineer (MDOT Form 1130). Except as otherwise approved, once road work (except tree removal) is started on any maintaining traffic phase, work continuously until completion of leveling course. Once public road approach and private driveway surfaces are removed, place temporary ramps by the end of the workday, and maintain temporary ramps until the public road approach or driveway is resurfaced, according to the Special Provision for Maintaining Traffic. Schedule clearing and tree removal work such that all trees are felled between October 1, 2025 and March 31, 2026 This work consists of preparing all lawns and slopes on non-freeway projects designated for slope restoration on the plans or as directed by the Engineer and applying topsoil, fertilizer, seed, mulch with mulch anchor, mulch blanket, high velocity mulch blanket, permanent turf reinforcement mat (TRM), bonded fiber matrix (BFM), or modified mulch blanket to those areas. Ensure turf establishment is in accordance with section 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer. Question Deadline 07/24/2025 at 5:00 PM ET Contractors shall direct all questions to the project engineer, Dan Troia, PE of Spalding DeDecker (517) 679-4400 or dtroia@sda-eng.com Questions must be received

Award

Roads / Highways

$5,092,712.00

Public - County

Paving, Site Work

83

6

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
0
Bidding Soon
1,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 1, 2025

Project location map

Airport Rd, Dewitt, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.