BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Renovation of a fire / police facility in Ocala, Florida. Completed plans call for the renovation of a fire / police facility.

BACKGROUND 1. The City of Ocala requires the services of an experienced Contractor to provide light construction services/goods supporting the Facilities department. 2. MANDATORY PRE-BID MEETING: Refer to the listing for the pre-bid meeting date, time, and location. EXPERIENCE AND LICENSING REQUIREMENTS 1. Licensing Requirement: Bidder must possess a valid General Contractor's License in the State of Florida to submit a bid for this project. 2. Experience Requirement: Bidder must possess five (5) years' experience in providing Interior wall construction, drywall finishing, electrical and plumbing. Award will be made to the lowest bidder meeting all requirements outlined herein. Formal Question Due By: 8/4/2025 @ 5:00 PM EST Remove toilet and sink. Keep in a usable condition for re-installation after tile is installed. o Remove two water fountains. Reinstall one of the fountains in the main bay of the fire station next to an existing water fountain/bottle filler station. o Remove old wall tiles and floor tiles. o Replace damaged drywall from tile removal. Drywall construction shall be 5/8" gypsum board. The drywall shall be textured, primed, and painted with two coats to match existing walls in the area. o Remove the existing metal frame door to restroom. Keep in usable condition for reinstallation into a new location. o Frame out a 3'x4' shower to expand the footprint of the current restroom. Use metal framing and a cement board with a waterproofing membrane. Install a niche into the shower wall for toiletries. o Install drainage and a shower pan with a standard 4-inch lip. o Install plumbing for the shower head as well as plumbing for the hot and cold water. o Frame out the new entry wall and install the previously removed steel door and frame. o Install new large format (size to be determined) wall tile from floor to ceiling in the shower and from floor to 4' up onto the walls in the main area of the restroom. Use tile trim on all exposed tile edges. o Install new, small format tile or mosaic style tile in the shower pan and restroom floor. Use tile trim on all exposed tile edges. o Relocate/add ceiling light fixtures and switches. o In the existing restroom area, redesign the existing ceiling grid tiles in order to relocate HVAC grills/registers to provide adequate airflow to the restroom. o In the new shower addition, replace all grid style roof tiles with a green board moisture resistant drywall. Finish and paint to match existing wall/roof colors. o All work completed on this project must pass final building, electrical, plumbing, and mechanical inspections.

Award

Fire / Police

$38,990.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
151
Bidding Soon
2,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

320 NE 8th Ave, Ocala, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.