BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Demolition, site work, renovation and addition to an educational facility in Fond du Lac, Wisconsin. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; educational facility; and for site work for a educational facility.

Renovations and Addition to the E & G building wings on the Fond du Lac Campus. This development project features a 9,000-square-foot addition to the east side of an existing building, designed without a basement. Structural specifications include column loads of up to 30 kips (exterior) and 45 kips (interior), with wall loads capped at 3 kips per linear foot. The new structure will align with the existing building elevation at EL. 764, requiring minor grading adjustments. The site plan also includes a new parking lot and driveways intended for light traffic, primarily pedestrians and service vehicles. A stormwater management basin is planned for the southeastern corner of the site to support sustainable drainage. Any questions or clarifications are due no later than Friday, August 15 at 2:00 P.M. (CDT) via email to mark.wershay@zastudios.com to be considered. Phase 1 (Referendum Project) Commencement Monday, Novembers, 2025 Completion Thursday, July 2, 2026 Phase 2 (Non-Referendum Project) Commencement Monday, July 6, 2026 Completion Friday, December 18, 2026

Award

Educational

$7,760,000.00

Public - City

Addition, Demolition, Renovation, Site Work

114

29

54

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
90
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

November 3, 2025

Project location map

235 N National Ave, Fond du Lac, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.