Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a road / highway in Gray, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of August 21, 2025 , This project has been awarded to Blount Construction Company, Inc. in the amount of 1,624,339.22..** The Jones County Board of Commissioners will accept sealed bids for the construction of the project entitled FY2024 LMIG & FY 2024 LRA - Full Depth Reclamation Leveling, Overlay, and Stripping of Various County Roads . FY2024 LMIG & FY2024 LRA - Full Depth Reclamation, Leveling, Overlay, and Stripping of Various County Roads. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: FY2024 LMIG & FY2024 LRA - Full Depth Reclamation, Leveling, Overlay, and Stripping of Various County Roads. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) calendar days. Contractor License: Any Contractor submitting a bid must be licensed by a pre-qualified Georgia Department of Transportation Contractor and must be fully insured and bonded. License numbers must be written on the face of the bid envelope. No bid will be opened unless it contains the Contractor's license number. Work to Be Done: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled FY2024 LMIG & FY2024 LRA - Full Depth Reclamation Leveling, Overlay, and Stripping of Various County Roads. In general, the project consists of full-depth reclamation, leveling, overlay & stripping of Chippendale Road; Jeffie Russell Circle, Mattie Wells Drive, Green Shade Road, and other roads. Bonds: All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing, latest edition. Funding: Any Contract or Contracts awarded under this Advertisement for Bids are expected to be funded through the Jones County Board of Commissioners FY2024 LMIG, FY 2024 LRA Programs & SPLOST. The Owner: reserves the right to reject any or all bids, including without limitation, the right to reject any and all non-conforming , non-responsive, unbalanced or conditional bids and to reject the bid of any bidder whom the owner believes would not be in the best interest of the project to make an award to that bidder whether because the bid is not responsive, the bidder is unqualified, or of doubtful financial ability, or fails to meet any other pertinent standard or criteria established by the owner. Question Deadline 08/04/2025 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Completion- 120 consecutive calendar days Bid(10.0%), Performance(100.0%), Payment(100.0%), Certified Check

Award

Roads / Highways

$1,624,339.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

September 15, 2025

Project location map

Multiple Locations, Gray, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.