Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated October 25, 2025
Site work and paving for a mixed-use development in Rogers, Arkansas. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
The project includes, but is not limited to, construction of approximately 1,600 linear feet of asphalt taxilane pavement, water and sewer improvements, fencing installation, and grading and drainage improvements as shown on the plans and indicated in the specifications. All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 4.4% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals DBE). 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. covered area, are as follows: Timetables Goals for minority participation for each trade: 0.0% Goals for female participation in each trade: 6.9% These goals are applicable to Proposals shall be accompanied by a cashiers or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within ten (10) days after notice of award of Contract to him. City of Rogers, Rogers Executive Airport reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of City of Rogers, Rogers Executive Airport, and to reject nonconforming, nonresponsive, or conditional bids. Bids must remain in effect for 90 days after the bid opening date. Questions: Contractor questions taken until 2:00 PM on Friday, August 1, 2025 a. Schedules evaluated in order until there is a schedule within the available project funding b. Schedule 1 - Base Bid A i. Full scope as shown in plans c. Schedule 2 - Base Bid B i. Reduced earthwork north of North Taxilane TOFA and east of detention pond ii. Reduced pavement repair contingency iii. Reduced electrical infrastructure iv. Reduced restoration extents 1. Reduced to align with the limited grading extents d. Schedule 3 - Base Bid C i. Base Bid B reduction ii. Reduced earthwork south of North Taxilane TOFA and east of South Taxilane e. Schedule 3 - Base Bid C + Bid Alternate C-1 i. Base Bid C Reduction ii. Removes the cost for the electric gates iii. Will be updated to reflect electric gate removal with Addendum 1 f. Schedule 3 - Base Bid C + Bid Alternate C-2 i. Removes noise barrier fencing and replaces with standard chain-link fencing Bid Result: SCHEDULE 1 - BASE BID A - Emery Sapp & Sons, Inc. $3,651,087.76 SCHEDULE 2 - BASE BID B - Emery Sapp & Sons, Inc $3,259,581.96 SCHEDULE 3 - BASE BID C - Emery Sapp & Sons, Inc $3,042,764.96
Award
Transportation Terminals
$9,953,435.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
3 W Airport Dr, Rogers, AR
Related To This Project
Rogers, AR
--
Rogers, AR
Bid Date: Aug 01 2025
Rogers, AR
Bid Date: Aug 13 2025
Rogers, AR
Bid Date: Aug 05 2025
Rogers, AR
Bid Date: Aug 27 2025
Rogers, AR
Bid Date: Aug 11 2025
Rogers, AR
Bid Date: Aug 19 2025
Rogers, AR
Bid Date: Aug 18 2025
Rogers, AR
--
Rogers, AR
--
Rogers, AR
Bid Date: Jul 08 2025
Rogers, AR
Bid Date: May 30 2025
Rogers, AR
Bid Date: May 27 2025
Rogers, AR
Bid Date: May 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
