BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work, paving and renovation of a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for the renovation of a municipal facility.

Question Deadline 07/29/2025 All enquiries shall be directed to the Contract Administrator Lunide Milius-Alphonse Project Manager Telephone No. 204 896-1209 Email Address lmilius-alphonse@kgsgroup.com The work to be done under the Contract shall consist of the construction activities and tasks described under D2.2 and as shown on the construction contract drawings for the new hydrogen generation and dispensing station for heavy duty hydrogen fuel-cell buses (FCEBs). The major components of the Work are as follows: (a) Civil works including site grading and drainage, new underground utilities and trenching, pavement repairs for any trenching and potable water supply. (b) Structural works including piles, various hydrogen equipment pads and curbs, fencing and bollards. (c) Electrical power for the hydrogen station system including relocation of existing electrical within station footprint, provision of new power and communication connections to the station from existing owner infrastructure. A Performance Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Amount of Fifty Percent (50%) of the Contract Price; and Labour and Material Payment Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in an Amount Equal to Fifty Percent (50%) of the Contract Price. An Irrevocable Standby Letter of Credit Issued by a Bank or Other Financial Institution Registered to Conduct Business in Manitoba and Drawn on a Branch Located in Winnipeg, in the Amount of Fifty Percent (50%) of the Contract Price; or A Certified Cheque or Draft Payable to "the City of Winnipeg", Drawn on a Bank or Other Financial Institution Registered to Conduct Business in Manitoba, in the Amount of Fifty Percent (50%) of the Contract Price. Official bid documents must be obtained from www.merx.com

Bid Results

Sidewalks / Parking Lot

$1,410,000.00

Public - City

Paving, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
109
Bidding Soon
602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 8, 2025

Project location map

421 Osborne St, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.