Site work, new construction and renovation of a civil project in Detroit Lakes, Minnesota. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and for the renovation of a water / sewer project.
The CMAR Contract will include the following services and Work: Construction of a new 1.2-million-gallon equalization storage tank, including mixing equipment, controls, and cover. Modification to the existing influent discharge header to include modulating flow controls valves, flow meters, piping, control structures, and controls to split screened, pumped influent between fine screening and the equalization storage tank. Modifications to the existing 36-inch influent gravity sewer to construct new flow control structures, slide gates and frames, piping, and accessories to divert gravity influent flow prior to the Influent Waste Complex wetwell to the equalization storage tank. Construction of new modulating flow controls valve, flow meter, piping, control structures, and controls to control and meter flow from the equalization tank to the Influent Waste Complex wetwell. Modifications to the existing influent complex for piping, excavation, penetrations, utilities, and restoration required to perform the work as noted above. Temporary piping, pumping, controls, and monitoring required to perform the work as noted above. Removal of and installation of new site fencing and gates. Plant water and potable water piping and hydrants. Site improvements including grading, sidewalk, and lighting. Site restoration and turf establishment. Additional miscellaneous civil, electrical, mechanical, structural, and architectural improvements may be required to perform the work as noted above. DLPUC anticipates that the CMAR's Guaranteed Maximum Price will be approximately $4.5 - $6.5 million. DLPUC anticipates awarding the CMAR Contract for the Project in August 2025. The preconstruction and construction of the Project will need to be completed by June 2027 in accordance with the requirements of the grant funding received by DLPUC. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. Construction Phase Work shall be subject to minimum wages and labor standards in accordance with Minnesota State Prevailing Wage Rates (Highway/Heavy for Becker County). The Owner reserves the right to reject any and all SOQs, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/18/2025 All questions or comments should be directed to SEH Engineer Eric Miller at emiller@sehinc.com
Post-Bid
Water / Sewer
$6,500,000.00
Public - City
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2025
March 30, 2026
1025 Roosevelt Avenue, Detroit Lakes, MN
Related To This Project
Detroit Lakes, MN
Bid Date: Jul 28 2025
Detroit Lakes, MN
Bid Date: Oct 02 2025
Detroit Lakes, MN
Bid Date: Sep 26 2025
Detroit Lakes, MN
Bid Date: Oct 30 2025
Detroit Lakes, MN
Bid Date: Oct 20 2025
Detroit Lakes, MN
Bid Date: Nov 25 2025
Detroit Lakes, MN
Bid Date: Dec 01 2025
Detroit Lakes, MN
Bid Date: Jul 22 2025
Detroit Lakes, MN
Bid Date: Jun 12 2025
Detroit Lakes, MN
Bid Date: Jun 04 2025
Detroit Lakes, MN
Bid Date: May 29 2025
Detroit Lakes, MN
Bid Date: May 08 2025
Detroit Lakes, MN
Bid Date: May 07 2025
Detroit Lakes, MN
Bid Date: Jun 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.