Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
Site work for a mixed-use development in Conshohocken, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.
**As of September 18, 2025 , this project has not yet been awarded. The project is expected to be awarded on the next meeting in October** The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and described in the Specifications entitled Prepared by Pennoni, Borough Engineer, 3100 Horizon Drive, Suite 200, King of Prussia, Pa 19406 acting as and in these Contract Documents, entitled the Engineer, and shall do everything required by the Agreement and the Contract Documents. Contractor shall furnish all materials, implements, machinery, equipment, tools, supplies, transportation, labor and supervision required to construct the facilities as shown on contract drawings and specified herein. It shall be the responsibility of the Contractor to proceed with the work in the manner and within such limitations as may be prescribed by the Engineers. CONSTRUCTION LIMITS Contractor shall confine his operations strictly within the limits, indicated by the plans and/or directed by the Engineers, unless written permission is obtained to occupy additional ground. Upon completion of work the Contractor shall clean-up and restore the area of his operations to a condition at least equal to original conditions. Unless specified elsewhere herein, all restoration shall be included in the Contractors unit and/or lump sum prices bid. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractors expense. MEASUREMENT OF WORK AND MATERIALS The Contractor will be paid for the actual quantity of authorized work or material furnished under each item of the contract, at the prices stipulated for each items. If the quantity of any unit price item is increased, the Contractor shall not be entitled to compensation over or above the unit price bid for such item. If the quantity of any unit price item is decreased the Contractor shall have no claim for damages on the basis of loss of anticipated profits. All quantities of work and material to be paid will be determined by the Engineers in accordance with working lines specified in the contract documents. Mackenzie Park Site Improvements Phase 2d Lsa Grant This project includes the furnishing of all labor, materials, tools and equipment for site work, outdoor basketball courts and construction of pre-fabricated pavilion Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids. Each proposal must be accompanied by a certified check or bid bond payable to the Borough of West Conshohocken in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed, to do business in the Commonwealth of Pennsylvania will be accepted and the bond shall so state same. Bid surety checks and bid bonds will be returned to unsuccessful bidders after the awarding and signing of the Contract. The successful bidder(s) will be required to furnish Performance and Labor and Material Bonds in one hundred percent (100%) of the amount of the contract; a Maintenance Bond in the amount of twenty-five percent (25%) of the total contract price, as well as a Certificate of Insurance. PA Prevailing Wages are required. Question Deadline Aug 5th 2025, 12:00 PM EDT online question submission The Borough reserves the right to waive any informality, or to reject any or all bids, or take such action as it may deem in the best interest of the Borough and as may be permitted by law. QA- 8/4/25: Material supplier requirements for temp will be taken into consideration and depending on weather conditions the final surface may be delayed till 2026 and acceptable temps. The size of the pavilion is 20 x 40
Bid Results
Playgrounds / Parks / Athletic Fields
$375,719.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
September 10, 2025
To Be Determined, Conshohocken, PA
Related To This Project
Conshohocken, PA
Bid Date: Aug 05 2025
Conshohocken, PA
--
Conshohocken, PA
--
Conshohocken, PA
--
Conshohocken, PA
Bid Date: Sep 17 2025
Conshohocken, PA
--
Conshohocken, PA
--
Conshohocken, PA
Bid Date: Aug 19 2020
Conshohocken, PA
Bid Date: Jul 22 2025
Conshohocken, PA
Bid Date: Jul 10 2025
Conshohocken, PA
Bid Date: Jun 17 2025
Conshohocken, PA
Bid Date: May 30 2025
Conshohocken, PA
Bid Date: Jun 03 2025
Conshohocken, PA
Bid Date: May 09 2025
Conshohocken, PA
Bid Date: May 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
