BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

This is a service / maintenance or supply contract in Shelbyville, Tennessee. Contact the soliciting agency for additional information.

The project scope is to furnish supervision, labor, equipment, tools, supplies, transportation of equipment, labor, transportation of materials supplied by the Contractor and/or materials supplied by MLGW, to construct and maintain the Overhead Electric Distribution/Transmission System to MLGW's most current Construction Standards. This work will be performed on MLGW's energized overhead primary voltage (12kV/23kV and 115kV/161kV) and secondary voltages (120/240, 240/480, 120/208, 227/480 etc.,) to include both the street and rear property line of the MLGW Overhead Electric Distribution/Transmission System (with or without mechanical equipment) as directed by the MLGW Representative throughout Memphis and Shelby County, Tennessee in accordance as outlined in the Contract Documents and Specifications. The Tennessee Contractor's Classification required for this project shall be one of the following or any Tennessee approved contractor's license applicable to this project: CE If a State of Tennessee Contractor's license is required, the Contractor's license monetary limits must meet or exceed the Contractor's bid price. This project is exempt from the mandatory contractor's licensing requirements if the bid amount is under $25,000. If the bid amount is under $25,000, the phrase "Exempt from licensing requirement" must appear in the Tennessee License number space on the preprinted bid envelope provided. However, other required information (e.g., Project title, contractor's company name, contractor's address and bid due date) must be completed. Before the execution of the contract, the Successful Bidder shall be required to furnish a Performance Bond in an amount equal to 100% of the bid price or such lesser amount as determined at the sole discretion of MLGW. The bond shall be made upon the form in this packet and shall be made a part of the Contract. The surety company shall be acceptable to MLGW. Before the execution of the contract, the Successful Bidder shall furnish, pursuant to Tennessee Code Annotated 12-4-201, a Contractor's Labor and Materials Payment Bond in a determined sum of no less than 25% of the bid price. The bond shall be made upon the form provided by MLGW in this packet and shall be made part of the Contract Documents. Such surety shall be acceptable to MLGW. All contract bonds shall be written through a surety company duly authorized to do business in Tennessee. No bidder may withdraw a bid for a period of 120 days after the date and hour set for the opening of bids. MLGW reserves the right to reject bids, to waive Minor Irregularities in the bids received and to accept any bid or portion of the bid, which MLGW, in MLGW's sole discretion, deems most favorable to the interest of MLGW. Direct all questions to Arma Orr at aorr@mlgw.org; (901) 528-4020.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
59
Bidding Soon
1,391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 26, 2025

Project location map

To Be Determined, Shelbyville, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.