Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Renovation of a military facility in Gaithersburg, Maryland. Working plans call for the renovation of a military facility.
PROJECT DESCRIPTION A. The scope of this project is to replace four (4) Uninterruptible Power Supplies (UPS) for AML complex located in Gaithersburg UPS system at Buildings 215, 216, 217 and 218 with an option to replace one Green power UPS at Building 219. o Building 215, room D02, UPS1-2-LL/69-1, Yellow Power UPS, 100 KVA o Building 216, room C320. UPS1-5-D/49-1, Yellow Power UPS, 100 KVA. o Building 217, Room C322. UPS1-5-S/13-1, Yellow Power UPS, 100 KVA o Building 218, Room B09. UPS1-2-T/43.4-1, Yellow Power UPS, 100 KVA o Option: Building 219, Room A21. UPS2-2-CC/26.3-1, Green Power UPS, 200 KVA B. The Contractor shall provide turnkey service for UPS replacement including field investigation, shop drawings, installation planning, ion documents, equipment specifications, new equipment provision, equipment removal, and installation of a fully functional and operational new equipment. C. The Contractor shall provide remote storage for new equipment until installation. D. Refer to attached AML arc flash study for protective settings of the new UPS system. E. The new UPS system shall have the same KVA rating as the existing UPS system. F. Provide equipment review submittals for approval prior to equipment release. G. Provide As-built Record Drawings using contractor red-lined drawings H. OF WORK: Four Yellow power UPS systems are located in Buildings 215, room D02 Building 216, room C320 Building 217, room C322, and B218, room B09. The Green power UPS system is in Building 219, room A21. I. PERIOD OF (based on calendar days): 550 days for base bid after issuance of notice to proceed (NTP). Additional days to be established if any of the optional UPD is included in the bid. a. POP is based on a minimum of two ion shop drawing submittals (e.g., 50 design and 95 final) and two government reviews. b. POP assumes a maximum of 60 days for Pre NTP activities (e.g., health and safety plan submittal and approval, start of badging process). c. POP assumes long lead times for procurement of UPS units. NIST Gaithersburg Campus 100 Bureau Drive Gaithersburg, MD 20899 PERIOD OF (PoP) Approximately 550 calendar days for base award. The base award PoP is based on a minimum of two ion shop drawing submittals (e.g., 50 design and 95 final) and two government reviews. The base PoP assumes a maximum of 60 days for pre-notice to proceed (NTP) activities (e.g., health and safety plan submittal and approval, start of badging process). The base award PoP assumes long lead times for procurement of UPS units. See clause FAR 52.211-10, Commencement, Prosecution, and Completion of Work. The Method of Contractor Selection has not been determined at this Time
Final Planning
Military
$30,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
100 Bureau Dr, Gaithersburg, MD
Related To This Project
Gaithersburg, MD
Bid Date: Aug 06 2025
Gaithersburg, MD
Bid Date: Aug 27 2025
Gaithersburg, MD
Bid Date: Aug 28 2025
Gaithersburg, MD
Bid Date: Aug 18 2025
Gaithersburg, MD
Bid Date: Oct 28 2025
Gaithersburg, MD
Bid Date: Sep 05 2025
Gaithersburg, MD
Bid Date: Sep 19 2025
Gaithersburg, MD
Bid Date: Sep 11 2025
Gaithersburg, MD
--
Gaithersburg, MD
--
Gaithersburg, MD
--
Gaithersburg, MD
Bid Date: Jul 14 2025
Gaithersburg, MD
Bid Date: Aug 25 2025
Gaithersburg, MD
--
Gaithersburg, MD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
