Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated December 2, 2025
Renovation of a mixed-use development in New Bedford, Massachusetts. Completed plans call for the renovation of a hospitality development; and multi-residential development.
Bid date has been extended from 08/06/2025 at 2:00 PM ET to 09/24/2025 at 2:00PM EDT Metal Windows, Plumbing, HVAC, & Electrical. NBHA Hotel Apartments. This Project consists of the renovation of the existing laundry room, the renovation of the existing accessible entry, the addition of a new entry canopy over the top landing of the existing accessible entrance and all related work. The project also includes temporary accessible access to the building while the front entry work is being performed and a temporary laundry facility will be created in the adjacent community room for the duration of the project. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Filed Sub-bid RFI deadline: 8/1/25 @ 4:00 P.M. online submitted GENERAL PROVISIONS A. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: The renovation of the existing laundry room, the renovation of the existing accessible entry and the addition of a new entry canopy over the top landing of the existing accessible entrance. Temporary accessible access to the building while the front entry work is being performed. A temporary laundry facility will be created in the adjacent community room for the duration of the project. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. Bid Result Metal Windows JJ Cardosi, Inc. $54,800 FSB Plumbing Araujo Bros Plumbing & Heating, Inc. $44,000 HVAC Apex Corp $173,500 Electrical Work MAK Electric $49,910
Bid Results
Multi-Residential
$322,210.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
October 10, 2025
725 Pleasant St, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: Oct 01 2025
New Bedford, MA
Bid Date: Sep 09 2025
New Bedford, MA
Bid Date: Aug 07 2025
New Bedford, MA
Bid Date: Aug 12 2025
New Bedford, MA
Bid Date: Aug 15 2025
New Bedford, MA
Bid Date: Aug 20 2025
New Bedford, MA
Bid Date: Aug 28 2025
New Bedford, MA
Bid Date: Sep 10 2025
New Bedford, MA
Bid Date: Jul 30 2025
New Bedford, MA
Bid Date: Jul 22 2025
New Bedford, MA
Bid Date: Jul 22 2025
New Bedford, MA
Bid Date: Jun 27 2025
New Bedford, MA
Bid Date: Jun 03 2025
New Bedford, MA
Bid Date: Jun 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
