Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2025 at 8:00 PM
Updated September 9, 2025
Demolition, site work and asbestos abatement for a municipal facility in Selma, Alabama. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Asbestos Abatement, Demolition, Removal, and Legal Disposal of Four Existing Structures Question Deadline 08/08/2025 Contractor Questions Received (by email) Each Bidder Must Deposit With Their Proposal a Bid Bond or Certified Check in an Amount Equal to Five Percent (5%) of the Total Bid Payable to the Cfaia as Bid Security; However, It Shall Not Exceed $10,000. The Successful Bidder Shall Furnish a Performance Bond and a Payment Bond Each in the Amount of 100% of the Contract Amount Awarded. All Bonds Shall Be Submitted on Aia Forms, Latest Revisions. Bidders Shall Also Submit a Current Financial Statement if Requested by the Cfaia. Attorneys-in-fact Who Sign Bid Bonds or Payment Bonds and Performance Bonds Must File With Each Bond a Certified and Effective Dated Copy of Their Power of Attorney. Proposals Shall Be Submitted in Whole, Sealed and Deposited, With the Cfaia Prior to the Hour and Date Above Designated. Title 34, Chapter 8, Code of Alabama, 1975, Requires Licensing for General Contracting When the Cost of the Work Exceeds Amounts Established by the State Licensing Board for General Contractors. Under This Law It is Incumbent Upon the Design Professional and Awarding Authority/owner to Require Each Bidder to Show Evidence of This License Before Bidding. In the Absence of Such Evidence, a Bid Shall Not Be Received or Considered. Therefore, the Outside of the Envelope in Which a Bid is Delivered Must Bear the Bidder's Name and State License Number for General Contracting and the Envelope Must Be Sealed. The Bid Must Not Be Received in the Absence of Any of These Features. The Sum Being Bid May Be Changed by the Bidder by Writing the Change in Price, Over the Bidder's Authorized Signature, on the Envelope; However, if the Sum Being Bid is Revealed on the Envelope, the Bid No Longer Constitutes a "Sealed Bid" and Must Not Be Received. No Change in Price May Be Made After the Time Designated for Receipt of Bids. Bid Security Must Be Furnished With Bids in Excess of $50,000.00. Bid Security Shall Be in the Form of a Bid Bond (Executed by a Surety Company Duly Authorized and Qualified to Make Such Bonds in Alabama) or a Cashier's Check (Drawn on an Alabama Bank) Payable to the Awarding Authority/owner. The Amount of the Bid Security Must Be Not Less Than 5% of the Awarding Authority's/owner's Estimated Cost of the Work or of the Contractor's Bid, but is Not Required to Be More Than $10,000.00. If a Bid Bond is Furnished in Lieu of a Cashier's Check, Dcm Form C-4, Form of Bid Bond, is to Be Used. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. epv it's around $400-$440k
Post-Bid
Municipal
$440,000.00
Public - Federal
Asbestos Abatement, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2025
September 22, 2025
To Be Determined, Selma, AL
Related To This Project
Selma, AL
Bid Date: Jul 24 2025
Selma, AL
Bid Date: Aug 19 2025
Selma, AL
Bid Date: Sep 25 2025
Selma, AL
Bid Date: Oct 10 2025
Selma, AL
Bid Date: Nov 20 2025
Selma, AL
Bid Date: Dec 11 2025
Selma, AL
Bid Date: Jul 31 2025
Selma, AL
Bid Date: Jul 11 2025
Selma, AL
Bid Date: Jun 30 2025
Selma, AL
Bid Date: Jun 27 2025
Selma, AL
Bid Date: Jun 17 2025
Selma, AL
Bid Date: Jun 05 2025
Selma, AL
Bid Date: Jun 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
