BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work for a water / sewer project in Selma, Alabama. Completed plans call for site work for a water / sewer project.

Separate sealed bids will be received for Contract 5 - Re-Route Watermain on Highland Avenue (in front of Ford Dealership), DWSRF Project No. FS010256-03. Bidders must obtain bidding documents from HSA Engineers, Inc. upon payment of $100.00 per set, with an additional $25.00 for shipping and handling. Those submitting a bonafide bid and returning documents in usable condition within ten days after bid opening will receive a full refund. A cashier's check or bid bond totaling at least 5% of the bid must accompany each bid. Performance and payment bonds and evidence of insurance, as required in the bid documents, are required at contract signing. Bidders on projects exceeding $100,000 must be licensed in accordance with Title 34, Chapter 8, Code of Alabama, 1975, as amended, for the type of work proposed. Evidence of such license must be clearly displayed on the outside of the sealed bid envelope. No bidder may withdraw their bid within sixty days after the date of bid opening. The owner reserves the right to waive informalities or reject any or all bids and to award the contract to the lowest responsible, responsive bidder.

Award

Water / Sewer

$275,686.00

Public - City

Site Work

6

13

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 16, 2026

Project location map

Highland Avenue, Selma, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.