Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and paving for a mixed-use development in Morton Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Fifth Third Bank Make Ready Utility Improvements The proposed improvement is officially known as the Village of Morton Grove Fifth Third Bank Make-Ready Utility Improvements. This project will be financed by Village of Morton Grove funds. The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required install approximately 36 feet of 10-inch storm sewer service pipe; connect storm sewer pipe to combination sewer; disconnect 1-1/2-inch diameter water service from water main; pressure connection and 5-foot diameter valve vault to existing 12-inch water main; install approximately 54 feet of 6-inch diameter water main pipe; install approximately 21 feet of 12-inch diameter casing pipe; trench backfill; construct approximately 37 square yards 10-inch thick concrete pavement patch, construct approximately 5 tons of hot-mix asphalt surface replacement; remove and replace approximately 10 feet of curb and gutter; remove and replace approximately 350 square feet of sidewalk on Illinois Department of Transportation right-of-way, and all other incidental work necessary to complete this improvement according to the Contract Documents. All Proposals must be accompanied by a proposal guaranty in a minimum amount of 5% of the bid amount as provided in the General Provisions and, where applicable, in BLRS Recurring Special Provision for "Bidding Requirements and Conditions for Contract Proposals" contained in the IDOT Supplemental Specifications and Recurring Special Provisions, adopted January 1, 2025. The right to waive any irregularity and to reject any or all bids is reserved to the President and Board of Trustees of the Village of Morton Grove. All contracts for the construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS, 130/1 et seq.). General questions regarding the Contract Documents should be directed to Mr. Chris R. Tomich, P.E., Village Engineer, Public Works Department, via fax to (847) 965-9511. All detailed questions concerning the actual bid specifications should be forwarded in writing via fax no less than five business days prior to the scheduled bid opening date. COMPLETION DATE/WORKING DAYS: November 30, 2025

Award

Water / Sewer

$95,992.00

Public - City

Paving, Site Work

24

7

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
285
Bidding Soon
3,580
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 26, 2025

Project location map

Multiple Locations, Morton Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.