BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated November 26, 2025

Site work and paving for a mixed-use development in Pflugerville, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Furnishing all labor; material, tools and equipment and performing all work required for the Helios Way Right-In and Right-Out Driveway which consists of increasing the width of the existing pavement from approximately 25 feet to 36 feet and installing a new driveway onto the SH130 frontage road with acceleration and deceleration lanes. Existing 25-foot-wide asphalt on Helios Way will be removed and replaced with 36' concrete pavement. New curbs, gutters, and storm sewer inlets will be installed along the widened drive including storm sewer extensions from the existing inlet locations to the proposed inlet locations. Impact Way Phase IV consists of approximately 2,673 linear feet of 12"-16" water lines, 977 linear feet of 8"-12" wastewater lines, 48 linear feet of 4'x4' reinforced concrete box, 708 linear feet of 6'x4' reinforced concrete box, 658 linear feet of 18"36" storm sewer, retaining wall structure, 1,575 linear feet of 44'-wide asphalt roadway with sidewalks, grading, site work, and appurtenances. The deadline to ask questions is 8/05/2025 2:00 PM

Post-Bid

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

172

19

4

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
110
Bidding Soon
2,741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 2, 2025

Project location map

Multiple Locations, Pflugerville, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.