BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated October 21, 2025

Renovation of a mixed-use development in Needville, Texas. Completed plans call for the renovation of a educational facility.

High School Domestic Water Modification Elementary School HVAC Modifications Middle School BMCS Upgrades A Proposal Bond from a bonding company acceptable to Needville ISD, or a certified check, in an amount equal to 10% of the greatest amount proposed must accompany each proposer's proposal. PERFORMANCE AND PAYMENT BOND: A Payment Bond and Performance Bond, each in an amount equal to 100% of the potential Contract Sum, conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to Needville ISD. Question Deadline 07/28/2025 at 5:00 PM CT Qualification statements may be submitted by email or hard copy to alan.penn@salasobrien.com. This information must be received at the office The prevailing rates of wages are the minimums that must be paid in conformance with all applicable laws of the State of Texas. By submitting this Proposal Form, the Proposer agrees to start on-site work after receipt of Signed Contract, Purchase Order and approved insurance and achieve Substantial Completion of all the Work not later than August 1, 2026. PROPOSER'S QUALIFICATIONS DUE: 7-28-2025 - Salas O'Brien 10930 W. Sam Houston Parkway N.. #900 Houston, TX 77064 Attn: Alan Penn alan.penn@salasobrien.com Salas O'Brien Project Number: Houston 10930 W. Sam Houston Pkwy North, Suite 900 Houston, TX 77064 F-4111 LOCATIONS NEEDVILLE HIGH SCHOOL 16319 TX-36, NEEDVILLE, TX 77461 NEEDVILLE MIDDLE SCHOOL 16411 FRITZELLA ST, NEEDVILLE, TX 77461 NEEDVILLE ELEMENTARY SCHOOL 3600 MARGARET ST, NEEDVILLE, TX 77461 2550-00620-00 2550-00614-00 2550-00621-00 Needville High School Needville Middle School Needville Elementary School During construction, the balancing agency shall inspect the installation of the piping systems, sheetmetal work, temperature controls, energy management system, and other component parts of the heating, ventilating, and air conditioning systems. One inspection shall take place when 60% of the ductwork is installed and another inspection shall take place when 90% of the equipment is installed. The balancing agency shall submit a brief written report of each inspection to the Architect and Engineer.

Post-Bid

Educational

$2,350,000.00

Public - City

Renovation

46

12

25

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
235
Bidding Soon
3,085
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

October 7, 2025

Project location map

Multiple Locations, Needville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.