Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 8, 2026 at 8:00 PM
Updated June 10, 2026
Demolition, site work, renovation and addition to an educational facility in Needville, Texas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a 171,950-square-foot educational facility; and for site work for a educational facility.
Project includes demolition of existing driveways and site paving, canopies, relocation of a metal building, and sections of building envelope.The additions include a new cafeteria, classrooms, dance hall, locker room expansion, site paving, and a pre engineered metal building with a multipurpose sports field beneath. Project will include all scopes for a complete assembly of ground-up building additions. Total Sqft = 171,950 Sports Renovations = 17,400sqft Sports/Dance Addition = 17,400sqft Cafeteria = 4,500sqft Multi-Purpose = 84,000sqft Please send project related questions to Will Klaus at wklaus@drymalla.com Proposal security in the form of a Proposal Bond (Section 00 61 00) made payable to the Owner in an amount equal to 5% of the largest possible total of the proposal will be required for all proposals. PROJECT DESCRIPTION In general, the project consists of NEEDVILLE HIGH SCHOOL ADDITIONS which includes but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, built up roofing, masonry, stone veneer, steel and plastic laminate covered doors, storefront system, electrical, plumbing, and HVAC. Interior finishes include but are not limited to: steel studs and drywall, resilient flooring, carpet tiles, ceramic tile, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, plaque, identifying devices, and window blinds. Guaranty Bonds in the form of a 100% Performance Bond and a 100% Payment Bond may be required from any subcontractor whose proposal is in excess of $100,000 at the option of the Construction Manager. Sub-Contractors shall Refer to the Construction Manager's information packet.
Post-Bid
Educational
$31,673,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
