BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work for a water / sewer project in Rapid City, South Dakota. Completed plans call for site work for a water / sewer project.

Black Hawk Water User District Norman Ave Watermain Description: The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: 1. Installation of approximately 1,700 LF of new 10" PVC water main along Norman Ave. BIDDING REQUIREMENTS: Bids shall be submitted on the Bid Forms provided and in accordance with the Bidding Documents. No bids will be considered unless sealed and filed at Black Hawk Water Users District - Main office, Blackhawk, SD. Each Bid shall be accompanied by a certified check, cashier's check or a bank draft drawn on a State or National Bank for five percent (5%) of the amount bid payable to Black Hawk Water Users District or in lieu thereof a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the Black Hawk Water Users District, in a sum equal to ten percent (10%) of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. The checks of unsuccessful bidders will be returned within thirty (30) days after the bids have been opened. Only Bids that are accompanied by such a Bond will be considered. All Bidders shall have a valid South Dakota Contractor's license of the appropriate Class for the work, as required by ARSD 20:53:06 or SDCL 36-25. Bidders shall enclose a copy of their license or Certificate of Renewal in the same envelope as the Bidders Bond. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license. Any deficient Bid submitted will be returned to the Bidder unopened. The Contractor shall be able to demonstrate that they have successfully completed municipal utility work of a similar nature and scope as that required for the project. All questions related to the project must be submitted in writing to the engineer's contact by July 31, 2025, end of day. OWNER'S RIGHTS RESERVED: All Bids will be made on the basis unit price as indicated in the Bid Form. The Owner reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the Owner. No Bidder may withdraw their bid for a period of thirty (30) days after the date of Bid opening. The Work shall be substantially completed by May 1, 2026, and shall be completed and ready for final payment on or before June 1, 2026. Q&A 07/31/2025 at 12:00 PN - 11963-2025-001

Post-Bid

Water / Sewer

$335,194.00

Public - City

Site Work

1

19

11

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

August 7, 2025

Project location map

Norman Ave, Rapid City, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.