Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Renovation of a military facility in Dawson, Georgia. Completed plans call for the renovation of a military facility.
The U. S. Department of Agriculture, Agricultural Research Service area office in Dawson, GA has a requirement for replace an existing air handler unit. Location - 1011 Forrester Dr SE Dawson, GA 39842 The Air Handling Unit-2 is past its expected service life and components have begun to fail. The existing Coils have been repaired numerous times, and the framework and housing are corroded to the point of failure. The most cost-effective solution is to repair by replacement. Line Item 0001: o Submit proposed replacement AHU-2 unit to COR and LPOC for approval. o The specifications of the existing AHU-2 are as follows: 14,745 CFM with 20HP 480 v 3phase motor. The new motor to be VFD rated. o Removal and disposal of the old AHU-2 offsite in a legal, responsible man o Install approved direct replacement new AHU unit including Air Handling Unitassembly, cooling coil and motor assembly. o Connect new unit to existing ductwork and filter assembly, and test for air leaks o Make all electrical connections to units. o Reconnect the new unit to the chilled water supply pipes and reinsulate any damaged insulation, making sure any heat trace is protected and functioning. o Perform factory startup system and test for proper operation. o Verify that all grease fittings are easily accessible and serviceable. Vendors are urged and expected to inspect the site where the work will be performed. Vendors interested in attending the site visit must notify the Contracting Officer at osvaldo.rodriguez@usda.gov by 10:00 A.M. Eastern Time on July 29, 2025, to be added to the approved list. Site Visit Date: July 31, 2025, 9:00 AM Eastern Time, Location: National Peanut Research Laboratory 1011 FORRESTER DR, S.E. DAWSON, GA 39842 Quotes are due no later than 10:00 A.M. Eastern Time on August 7, 2025 via email at osvaldo.rodriguez@usda.gov. Information concerning the REE policies and procedures regarding the definitization of equitable adjustments for change orders under construction contracts and the time required for definitization of those actions per 15 U.S.C. 644 is available at https://www.ars.usda.gov/afm/apd/acquisitions/. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SBE (100%) The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, and supervision for complete construction of the following in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth in the attached Scope of Work. Questions are due in writing not later than 10:00 A.M. Eastern Time on August 1, 2025 to the Contracting Officer at the following email address: osvaldo.rodriguez@usda.gov.
Award
Military
$130,381.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 8, 2025
1011 Forrester Dr SE, Dawson, GA
Related To This Project
Dawson, GA
Bid Date: Oct 15 2025
Dawson, GA
Bid Date: Oct 15 2025
Dawson, GA
Bid Date: Dec 10 2025
Dawson, GA
Bid Date: Jan 08 2026
Dawson, GA
Bid Date: May 22 2025
Dawson, GA
Bid Date: May 06 2025
Dawson, GA
Bid Date: Dec 13 2024
Dawson, GA
Bid Date: Dec 13 2024
Dawson, GA
Bid Date: Aug 26 2024
Dawson, GA
Bid Date: Jul 08 2025
Dawson, GA
--
Dawson, GA
Bid Date: Dec 22 2023
Dawson, GA
Bid Date: Jul 10 2023
Dawson, GA
Bid Date: Mar 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.