BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Renovation of a fire / police facility in Bellingham, Washington. Completed plans call for the renovation of a two-story above grade fire / police facility.

The improvement consists of: Removal and replacement of existing stone veneer to repair weather resistive barrier, sheathing, flashings, and structural framing that has been compromised due to water infiltration. Storefront window framing system, entrance doors, and hardware are to be replaced at stone cladding areas. Some stucco removal above the ground-level stone wainscot is planned to facilitate installation of new flashings. Miscellaneous other repairs including patching interior gypsum board and painting is also planned. Price Range: $1,180,000.00 - 1,380,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All proposals must be on the Bid Proposal form provided by the City of Bellingham and must be accompanied by a certified check, cashiers check, cash, money order or bid bond payable to the Finance Director in an amount equal to or exceeding five percent (5%) of the total bid. Requests for clarification are due Friday, October 31, 2025 4:00:00 PM [(UTC-08:00) Pacific Time (US & Canada)]. THE EXISTING BELLINGHAM POLICE DEPARTMENT WAS CONSTRUCTED IN 1992. SUBSEQUENT INVESTIGATIONS AND REPAIRS HAVE BEEN PERFORMED OVER THE YEARS TO ADDRESS DEFICIENCIES IN THE ENVELOPE, INCLUDING STUCCO REPAIRS AND WINDOW REPLACEMENTS. THE SCOPE OF THIS PROJECT IS TO ADDRESS AREAS THAT HAVE NOT YET BEEN ADDRESSED, INCLUDING DEGRADATION OF THE EXISTING STONE PANELING AROUND THE PRIMARY ENTRANCE VOLUME, AND THE STONE WAINSCOT AROUND THE PERIMETER OF THE BUILDING. THE EXISTING STONE IS TO BE REMOVED AND REPLACED, AS THE PRESENCE AND CONDITION OF A WEATHER-RESISTIVE BARRIER IS UNKNOWN. STOREFRONT WINDOWS ARE TO BE REPLACED AT THE PRIMARY ENTRANCE VOLUME, AND CORRECTIONS ARE PLANNED FOR FLASHINGS WHERE MISSING AT THESE EXISTING ROUGH OPENINGS. EVIDENCE OF WATER INFILTRATION IS VISIBLE AT THE INTERIOR ADJACENT TO THESE OPENINGS, INDICATING POTENTIAL FOR DAMAGE TO THE LIGHT-GAUGE STEEL FRAMING SYSTEM.

Bid Results

Fire / Police

$1,605,418.00

Public - City

Renovation

62

39

16

8

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
2
Bidding Soon
1,472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

January 5, 2026

Project location map

505 Grand Ave, Bellingham, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.