Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in Helena, Montana. Completed plans call for site work for a water / sewer project.
The project consists of five (5) schedules and three (3) additive alternatives. Schedule One consists of replacing approximately 1,360 linear feet of asbestos cement (AC) water main with new 8-inch polyvinyl chloride (PVC) water main. Schedule Two consists of replacing approximately 700 linear feet of AC water main with new 8-inch PVC water main. Schedule Three consists of replacing approximately 660 linear feet of asbestos cement AC water main with new 8-inch PVC water main. Schedule Four consists of replacing approximately 690 linear feet of AC water main with new 8-inch PVC water main. Schedule 5 consists of replacing approximately 300 linear feet of only AC water main with new 8-inch PVC water main. Additive Alternative One consists of the installation of a new bulk water station, access road, and site grading for the new station. Additive Alternative Two consists of the replacement of approximately nine (9) mainline valves within the existing system. Additive Alternative Three consists of the replacement of approximately 1,100 linear feet of old AC water main with new 8-inch PVC water main. These improvements also include the installation of new water services, valves, and fire hydrants. All water services will be replaced from the main to the curb stop with 1-inch PE service line. All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering no later than 2:00 PM local time on August 1, 2025. Questions received after this date will not be answered. Oral questions will only be accepted at the PreBid conference. Written comments may be submitted to Tyler Burns of Great West Engineering by mail at: 6780 Trade Center Ave, Billings, MT 59101 or email at: tburns@greatwesteng.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Anticipated Award Date: August 11, 2025
Bid Results
Water / Sewer
$2,641,484.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
September 18, 2025
Multiple Locations, Helena, MT
Related To This Project
Helena, MT
Bid Date: Aug 11 2025
Helena, MT
Bid Date: Aug 26 2025
Helena, MT
Bid Date: Sep 09 2025
Helena, MT
Bid Date: Aug 18 2025
Helena, MT
Bid Date: Aug 26 2025
Helena, MT
Bid Date: Sep 05 2025
Helena, MT
--
Helena, MT
--
Helena, MT
Bid Date: Jul 29 2025
Helena, MT
Bid Date: Jul 15 2025
Helena, MT
Bid Date: Jul 08 2025
Helena, MT
Bid Date: Jun 26 2025
Helena, MT
Bid Date: Jun 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
