Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work and paving for a bridge / tunnel in Watonga, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Counties: Blaine / Caddo Calendar Days: 90 Days Description: Bridge Repair County Roads: Over Sugar Creek, Cedar Creek, Willow Creek, and Unnamed Creeks, at Multiple Locations in District v and Vii. Project Length = 0.00 Miles Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total Question Deadline July 25, 2025. - Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. OKDOT - 800 - Bridge Repair

Award

Bridges / Tunnels

$280,270.00

Public - State/Provincial

Paving, Site Work

15

4

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
49
Bidding Soon
746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

Multiple Locations, Watonga, OK


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed