Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2025 at 8:00 PM
Updated August 14, 2025
Site work for a power facility in Burlington, Vermont. Working plans call for site work for a power facility.
As of August 13, 2025, bids received were rejected as they were over the budget. No definite date for the rebid. The existing timbers of the cooling tower require selective replacement. This project will replace a portion of existing timbers during a maintenance outage that is already scheduled for October 18th through November 9th, 2025. There are two scopes of work to bid on. After evaluation of all bids, BED will select a single bid and its associated scope of work. Scope of work #1 Replace 50% of timbers in the cooling tower structure with Douglas Fir CCA pressure treated lumber. Quantities and dimensions of lumber for scope of work #1: 250 total 2"x4"x20' 250 total 2"x6"x20' 150 total 4"x4"x20' 150 total 4"x4"x10' All technical questions should be directed to Burlington Electric Department Purchasing Department (purchasing@burlingtonelectric.com) and must include the RFP Number in the Subject Line. Scope of work #2 Replace 25% of timbers in the cooling tower structure with Douglas Fir CCA pressure treated lumber. Quantities and dimensions of lumber for scope of work #2: 125 total 2"x4"x20' 125 total 2"x6"x20' 75 total 4"x4"x20' 75 total 4"x4"x10' The following requirements apply to both scopes of work: Removal and reinstallation of cooling tower fill media as necessary Removal and reinstallation of cooling tower components as necessary Clean up of debris Work must be 100% complete in the available time window October 18th through November 5, 2025. Pre-staging of materials prior to these dates may be acceptable and coordinated with BED. Material for the project will be supplied by the bidder All equipment rentals will be supplied by the bidder. Disposal of any chemicals used will be done by the bidder. Clean up and removal of all debris All technical questions should be directed to Burlington Electric Department Purchasing Department (purchasing@burlingtonelectric.com) and must include the RFP Number in the Subject Line
Final Planning
Power Plant
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
February 13, 2026
111 Intervale Rd, Burlington, VT
Related To This Project
Burlington, VT
Bid Date: Aug 06 2025
Burlington, VT
Bid Date: Aug 08 2025
Burlington, VT
Bid Date: Aug 22 2025
Burlington, VT
--
Burlington, VT
Bid Date: Sep 10 2025
Burlington, VT
Bid Date: Aug 27 2025
Burlington, VT
Bid Date: Dec 10 2025
Burlington, VT
Bid Date: Sep 10 2025
Burlington, VT
Bid Date: Aug 11 2025
Burlington, VT
Bid Date: Jul 31 2019
Burlington, VT
Bid Date: Jul 16 2025
Burlington, VT
Bid Date: Dec 02 2020
Burlington, VT
Bid Date: Jun 04 2025
Burlington, VT
Bid Date: May 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
