Site work for a power facility in Burlington, Vermont. Working plans call for site work for a power facility.

As of August 13, 2025, bids received were rejected as they were over the budget. No definite date for the rebid. The existing timbers of the cooling tower require selective replacement. This project will replace a portion of existing timbers during a maintenance outage that is already scheduled for October 18th through November 9th, 2025. There are two scopes of work to bid on. After evaluation of all bids, BED will select a single bid and its associated scope of work. Scope of work #1 Replace 50% of timbers in the cooling tower structure with Douglas Fir CCA pressure treated lumber. Quantities and dimensions of lumber for scope of work #1: 250 total 2"x4"x20' 250 total 2"x6"x20' 150 total 4"x4"x20' 150 total 4"x4"x10' All technical questions should be directed to Burlington Electric Department Purchasing Department (purchasing@burlingtonelectric.com) and must include the RFP Number in the Subject Line. Scope of work #2 Replace 25% of timbers in the cooling tower structure with Douglas Fir CCA pressure treated lumber. Quantities and dimensions of lumber for scope of work #2: 125 total 2"x4"x20' 125 total 2"x6"x20' 75 total 4"x4"x20' 75 total 4"x4"x10' The following requirements apply to both scopes of work: Removal and reinstallation of cooling tower fill media as necessary Removal and reinstallation of cooling tower components as necessary Clean up of debris Work must be 100% complete in the available time window October 18th through November 5, 2025. Pre-staging of materials prior to these dates may be acceptable and coordinated with BED. Material for the project will be supplied by the bidder All equipment rentals will be supplied by the bidder. Disposal of any chemicals used will be done by the bidder. Clean up and removal of all debris All technical questions should be directed to Burlington Electric Department Purchasing Department (purchasing@burlingtonelectric.com) and must include the RFP Number in the Subject Line

Final Planning

Power Plant

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
170
Bidding Soon
2,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

February 13, 2026

Project location map

111 Intervale Rd, Burlington, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.