Published July 31, 2025 at 8:00 PM
Updated August 9, 2025
Site work and paving for a mixed-use development in Burlington, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Contractor is responsible for the installation of the conduit system and hand holes shown on BEDs Project drawing # D14510100. This includes but is not limited to the following: 1) Excavate and backfill trench under the street, sidewalk and grass. Work includes excavation and disposal of concrete sidewalk, asphalt sidewalk and asphalt street. It also includes concrete encasement of all conduits installed under the street and installing plastic warning tape above the conduits during backfilling. 2) Excavate and backfill trench for joint trench use with BED and communication companies. Provide cost breakdown of cost to BED and cost to communication companies to be installed in one trench with proper horizontal separation. Contractor to coordinate with communication companies for design and construction standards required. 3) Provide and install all BED and communication conduits, conduit sweeps, spacers, pull rope, anchors, etc. This item includes connecting new conduits with existing capped conduits, installing a 500 lb. rated, 1/4" nylon or polypropylene pull rope in each conduit. BED conduit sweeps shall be schedule 40, PVC, 36" radius, unless otherwise indicated on BEDs project drawing. 4) Excavate, place and backfill any CDR boxes per the project specifications. BED shall install ground grids during installation. 5) Take all necessary means to protect excavation and work from erosion. 6) Perform at your own expense all required testing. The contractor shall employ an approved independent testing firm to take the required tests specified 7) Restore permanent surfaces to BED, City of Burlington Department of Public Works (DPW), property owner specifications, the specification on project drawings and all other attached documents. 8) All work as specified on the Project General Specifications document and drawings. Date project may begin 8/18/2025 Date project must be completed 10/10/2025 5 PM For technical questions concerning this bid package contact Paul Charbonneau PCharbonneau@burlingtonelectric.com and he will forward the email to the Engineering Department.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2025
August 18, 2025
Overlake Park & Deforest Rd, Burlington, VT
Related To This Project
Burlington, VT
Bid Date: Aug 22 2025
Burlington, VT
--
Burlington, VT
Bid Date: Sep 10 2025
Burlington, VT
Bid Date: Aug 27 2025
Burlington, VT
Bid Date: Dec 10 2025
Burlington, VT
Bid Date: Sep 10 2025
Burlington, VT
Bid Date: Sep 10 2025
Burlington, VT
Bid Date: Sep 09 2025
Burlington, VT
Bid Date: Aug 06 2025
Burlington, VT
Bid Date: Jul 25 2025
Burlington, VT
Bid Date: Aug 11 2025
Burlington, VT
Bid Date: Jul 31 2019
Burlington, VT
Bid Date: Jul 16 2025
Burlington, VT
Bid Date: Dec 02 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.