Renovation of a mixed-use development in Washington, District of Columbia. Completed plans call for the renovation of a municipal facility.
This project is for the US Capitol Power Plant G- Tunnel upgrades to the expansion joints on high-pressure steam and low-pressure condensate lines. The G Tunnel was installed in the 1950's to extend chilled water and steam services to the facilities on Capitol Hill. The G-Tunnel has had a series of improvements and renovations since 2006. The scope includes the following CLINS: The Base: -Selective demolition of existing mechanical expansion joints including pipe, structural supports and appurtenances to remove the existing G tunnel expansion joints on high-pressure steam and low-pressure condensate lines between Stations 0+00 and 6+50. -Replacement of G tunnel expansion joints and structural supports between Stations0+00 and 6+50 to allow for thermal expansion in the pipe. Expansion joint sizes include4", 8", and 10" externally pressurized bellows assemblies. -Demolition, including the pipe and appurtenances to remove the entirety of the existing G tunnel high-pressure condensate system between Stations 0+00 and approximately3+25. -Installation of a new high-pressure condensate system between Stations 0+00 and approximately 3+25. -Replacement of existing steam traps and addition of new steam traps between 0+00 and6+50. -Selective demolition, including pipe, pipe supports and appurtenances to remove segments of the existing G tunnel high-pressure steam lines in order to install a main steam line crossover to allow operation from either main to each branch between Stations 0+00 and 0+50 Value: $ 4,000,000 - $ 6,000,000 Contact the GC bidder(s) for access to project documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.
Post-Bid
Municipal
$6,000,000.00
Public - Federal
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 28, 2025
January 27, 2026
To Be Determined, Washington, DC
Related To This Project
Washington, DC
Bid Date: Aug 22 2025
Washington, DC
--
Washington, DC
Bid Date: Aug 01 2025
Washington, DC
Bid Date: Aug 11 2025
Washington, DC
Bid Date: Aug 19 2025
Washington, DC
Bid Date: Jul 25 2025
Washington, DC
Bid Date: Oct 16 2025
Washington, DC
Bid Date: Aug 07 2025
Washington, DC
--
Washington, DC
Bid Date: Jul 23 2025
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jul 21 2025
Washington, DC
Bid Date: Aug 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.