BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 29, 2025

Renovation of a mixed-use development in Washington, District of Columbia. Completed plans call for the renovation of a municipal facility.

This project is for the US Capitol Power Plant G- Tunnel upgrades to the expansion joints on high-pressure steam and low-pressure condensate lines. The G Tunnel was installed in the 1950's to extend chilled water and steam services to the facilities on Capitol Hill. The G-Tunnel has had a series of improvements and renovations since 2006. The scope includes the following CLINS: The Base: -Selective demolition of existing mechanical expansion joints including pipe, structural supports and appurtenances to remove the existing G tunnel expansion joints on high-pressure steam and low-pressure condensate lines between Stations 0+00 and 6+50. -Replacement of G tunnel expansion joints and structural supports between Stations0+00 and 6+50 to allow for thermal expansion in the pipe. Expansion joint sizes include4", 8", and 10" externally pressurized bellows assemblies. -Demolition, including the pipe and appurtenances to remove the entirety of the existing G tunnel high-pressure condensate system between Stations 0+00 and approximately3+25. -Installation of a new high-pressure condensate system between Stations 0+00 and approximately 3+25. -Replacement of existing steam traps and addition of new steam traps between 0+00 and6+50. -Selective demolition, including pipe, pipe supports and appurtenances to remove segments of the existing G tunnel high-pressure steam lines in order to install a main steam line crossover to allow operation from either main to each branch between Stations 0+00 and 0+50 Value: $ 4,000,000 - $ 6,000,000 Contact the GC bidder(s) for access to project documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Municipal

$6,000,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
431
Active Projects
212
Bidding Soon
2,977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2025

January 27, 2026

Project location map

To Be Determined, Washington, DC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.