Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 12, 2026 at 8:00 PM
Updated August 18, 2026
Site work and paving for a bridge / tunnel in Meadow Lake, Saskatchewan. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Replacement of existing bridges on Highway No. 155 over Cowan River located at: C.S. 155-01, km 15.4, North of Green Lake; and Highway No.155 over Beaver River located at: C.S. 155-01, km 25.8, North of Green Lake, Saskatchewan. TIMELINE: Project is in design. Tender and construction timelines may be confirmed late 2026/early 2027.
Design
Bridges / Tunnels
$1,500,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2027
Multiple Locations, Meadow Lake, SK
Related To This Project
Meadow Lake, SK
Bid Date: Aug 19 2025
Meadow Lake, SK
Bid Date: Aug 21 2025
Meadow Lake, SK
Bid Date: Aug 26 2025
Meadow Lake, SK
Bid Date: Aug 26 2025
Meadow Lake, SK
Bid Date: Sep 17 2025
Meadow Lake, SK
Bid Date: Oct 14 2025
Meadow Lake, SK
Bid Date: Feb 13 2026
Meadow Lake, SK
Bid Date: Mar 18 2026
Meadow Lake, SK
Bid Date: Aug 01 2025
Meadow Lake, SK
Bid Date: Jul 10 2025
Meadow Lake, SK
Bid Date: Jul 04 2025
Meadow Lake, SK
Bid Date: Jun 18 2025
Meadow Lake, SK
Bid Date: May 28 2025
Meadow Lake, SK
Bid Date: Apr 02 2025
Meadow Lake, SK
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
