BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2026 at 8:00 PM

Updated May 27, 2026

Demolition, site work and new construction of an educational facility in San Francisco, California. Conceptual plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

This project demolishes the 64,230 GSF northern portion of HSS (#3), and builds an 88,600 GSF replacement in its place. Included on CSU Seismic Priority List 2, HSS North is a three-story structure constructed in 1963 with shallow concrete foundation and post-tensioned concrete floor slabs, cast-in place concrete columns, and concrete structural walls. Together with HSS south, three wings extending east to west extend from a trunk aligning north and south; the resulting irregular shape subjects the building to twisting and torsional stresses during earthquakes. Similar to HSS South, the building lacks current life safety and disability standards including sprinklers and all ADA compliant restrooms. The simplex fire alarm system is beyond its useful expected life. Antiquated interior finishes and major MEP systems original to construction require substantial capital renewal investment. Not including seismic scope, the building's 10-year total need is nearly half of the shell replacement value, suggesting demo and rebuild as the appropriate solution. This new building will provide an additional 124 FTE and will provide adequate and flexible spaces for students. This project will be funded by Systemwide Revenue Bonds. As of May 26, 2026, The project is include in the California State University System's 2026-2031 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$100,823,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
189
Bidding Soon
3,538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

1600 Holloway Ave, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.