Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and paving for a road / highway in Lyle, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 19, 2025 this project was awarded to JJD Companies LLC in the amount of $509,647.75 The extent of the work involved is furnishing all labor and materials for construction of the Grove Street Improvements together with related subsidiary and incidental work including: The project consists of Sanitary Sewer, Watermain, Common Excavation, Aggregate Base, Bituminous Pavement, Concrete Walk, and Concrete Curb & Gutter. Each bid must be accompanied by an electronic copy of a certified check, cashier's check or bid bond payable to the City of City, Minnesota in the amount of at least 5% of the total bid as a guarantee that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday and holidays, after the award of the contract. This electronic copy will be facilitated through the online electronic bid service. The apparent low bidder will be required to submit a hard copy of the certified check, cashier's check or bid bond within three (3) days of the bid opening. Bidders shall not be permitted to withdraw their bids for a period of (60) days after the bids are opened. The Owner reserves the right to withhold up to two hundred and fifty percent (250%) of the cost to correct deficient work or complete work known at the time of substantial completion. Payment of money due will be made in cash no later than six-ty (60) days after completion of the work. The Owner reserves the right to withhold one percent (1%) of the total contract amount or five hundred dollars ($500), whichever is greater, pending completion and submission of all final paperwork by the contractor or subcontractors. "Final paperwork" shall be defined as any documents required to fulfill contractual obligations, including, but not limited to, operation manuals, payroll documents for projects subject to prevailing wage requirements, material certifications and warranties, DBE final clearance, NPDES Permit Termination, withholding exemption certificate, etc. Payment of money due will be made in cash no later than sixty (60) days after submission of all final paperwork. Each bid must be accompanied by an electronic copy of a certified check, cashier's check or bid bond payable to the City of City, Minnesota in the amount of at least 5% of the total bid as a guarantee that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday and holidays, after the award of the contract. This electronic copy will be facilitated through the online electronic bid service. The apparent low bidder will be required to submit a hard copy of the certified check, cashier's check or bid bond within three (3) days of the bid opening. Bidders shall not be permitted to withdraw their bids for a period of (60) days after the bids are opened. Payment for said Grove Street Improvements will be made in cash from cash on hand, from governmental grants, or from such other funds as may be legally used for such purposes. Monthly estimates will be made by the Engineer and payment will be made to the Contractor in the amount of ninety-five (95%) of said estimate. Final payment of money due will be made in cash no later than six-ty (60) days after substantial completion. For construction, reconstruction, or improvement of streets and highway, including bridges, "substantial completion" shall be defined as the date when construction related traffic devices and ongoing inspections are no longer required. The Contractor shall commence work after the Notice to Proceed based on the alternate selected. Alternate A shall complete all work, except bituminous wear course paving, on or before November 7, 2025. Bituminous wear paving for Alternate A shall be completed by July 3, 2026. Alternate B shall complete all work, except bituminous wear course paving, on or before Au-gust 29, 2026. Bituminous wear paving for Alternate B shall be completed by June 25, 2027. The successful bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond, both in an amount equal to one hundred (100) percent of the Contract price. Said bonds are to be issued by a responsible surety, approved by the City Council, and which shall guarantee the faithful performance of the Con- tract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Said bond shall also guarantee the maintenance of the improvements constructed for a period of two (2) years from and after its completion and acceptance by the City. Plans and specifications governing the construction of the proposed improvements have been prepared by WHKS & Co., Engineers, Planners, and Surveyors, Rochester, Minnesota, which plans and specifications and prior proceedings of the City Council referring to and defining said proposed improvements are hereby made a part of this notice and the proposed contract by reference, and the proposed contract shall be executed in compliance therewith. The City Council reserves the right to reject any and all bids and to waive technicalities and irregularities. STANDARD PLAN 5-297.250 Bid Result TOTAL ALTERNATE A , TOTAL ALTERNATE B JJD Companies LLC $ 1,019,296

Award

Roads / Highways

$509,648.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

24

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
5
Bidding Soon
634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

November 7, 2025

Project location map

Grove St, Lyle, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.