Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 24, 2026 at 8:00 PM
Updated July 30, 2026
Site work for a water / sewer project in Safety Harbor, Florida. Working plans call for site work for a water / sewer project.
Work in this project includes the installation of a new wastewater collection system consisting of approximately 2,800 linear feet of force main and four wastewater pumping stations in Philippe Park that will replace four onsite septic collection systems. The new system will connect to the City of Safety Harbor's wastewater collection system through the existing Lift Station No. 614. In addition, approximately 50 linear feet of the Lift Station No. 614 force main will be replaced at both the Lift Station and the discharge manhole. The County requested a project to review the existing aging sanitary sewer infrastructure within Philippe Park. The current septic system is at risk of failure which requires significant additional regular maintenance. As stewards of public resources, rehabilitation and transformation of the existing sanitary system aims to eliminate ongoing risk of wastewater contamination into the groundwater system as well as the environmentally sensitive portion of upper Old Tampa Bay. Efforts undertaken in this project will align with the County's desire to identify and address existing infrastructure as potential opportunities for environmental and fiscal stewardship by increasing infrastructure resiliency and protect or improve environmentally sensitive areas. Step 1 Question Submission Deadline:May 1, 2026, 3:00pm Bids Open 05/05/2026 at 3:30 PM ET Online Bid Opening - Bid will be opening via Public Microsoft Teams Meeting. https://gcc02.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_YTZlZTY4NzQtM2MzMS00NjNjLTk5OGEtODk2MTRlNjIwOTFl%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522c32ee18f-a4c7-46ff-af40-8ed605642745%2522%252c%2522Oid%2522%253a%2522ecc1ff84-6b2e-4f17-b319-6f41e3c81eb6%2522%257d&data=05%7C02%7Cmjurek%40pinellas.gov%7Cc6ec13b0a2e6447f656608dd8403df79%7Cc32ee18fa4c746ffaf408ed605642745%7C0%7C0%7C638811874341960915%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=SIpV0HhvlmNyc2KLaYJ%2Fj9NSsddXd6pBlQYZLCN6HX0%3D&reserved=0
Final Planning
Water / Sewer
$3,470,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2026
January 25, 2027
2525 Philippe Park Dr, Safety Harbor, FL
Related To This Project
Safety Harbor, FL
Bid Date: Sep 03 2025
Safety Harbor, FL
Bid Date: Dec 01 2025
Safety Harbor, FL
Bid Date: Nov 18 2025
Safety Harbor, FL
--
Safety Harbor, FL
--
Safety Harbor, FL
--
Safety Harbor, FL
Bid Date: Aug 26 2025
Safety Harbor, FL
--
Safety Harbor, FL
Bid Date: May 05 2025
Safety Harbor, FL
Bid Date: Mar 11 2025
Safety Harbor, FL
--
Safety Harbor, FL
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed