Renovation of a municipal facility in Fort Benning, Georgia. Completed plans call for the renovation of a municipal facility.

Contract Period 270 - Add an additional 30 days for project closeout All questions should be submitted in written form either by hand delivered hard copies, facsimile (fax) or electronic mail (e-mail). The Contracting Officer (KO / COR) shall determine the final date for submission of questions. 1. The Design, Work/Construction contract requirements are described herein this Statement of Work (SOW) and on the drawings, specifications (as provided, or per the guide specification), and FB-144R prepared by The Directorate of Public Works (DPW) which is conveyed as a 35% design. 2. In addition to the SOW, Drawings, Specifications, FB-144R, the contractor shall use when asked to provide 100% designs the resources located on the Whole Building Design Guide website and the Fort Benning - Installation Design Guide dated August 2010. Available from DPW upon request. 3. The SOW, drawings, and specifications may not identify all procedures (means and methods) or requirements necessary to accomplish the work. The contractor is expected to follow industry standards or manufactures instructions/recommendations. 4. The contractor shall provide all required supervision, labor, materials, and equipment to complete the work. 5. The superintendent shall be an individual with a minimum 5 years of experience with jobs of similar type and size. Provide resume of job site supervisors and key personnel. The superintendent shall be on the job site when work is being performed and will be available to the Government representatives. The contractor shall comply with all governing codes and standards. Contractor shall comply with Fort Benning Safety and Environmental laws and regulations. The contractor shall perform all work IAW government procedures for entering and working at Fort Benning. The government reserves the right to stop work at any time for safety, security reasons, and for national defense at no cost to the government. Liquidate Damages - In the event of delay (caused by contractor only) in project completion, Repair C2 Facility, English, Simpson, Roosevelt Range - Building 8000, 8006, 8011, the contractor shall pay $1,404.24 for the total LD Rate/Day.

Post-Bid

Municipal

$400,000.00

Public - City

Renovation

9

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 10, 2025

Project location map

To Be Determined, Fort Benning, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.