Renovation of a military facility in Fort Benning, Georgia. Completed plans call for the renovation of a military facility.
Period of Performance: 390 The purpose of this project is to replace an existing 125-ton York air-cooled chiller with a new high redundancy chiller to provide enhanced reliability and redundancy for cooling three separate buildings. The existing chiller serves as a critical component of the HVAC system, and its failure would result in the loss of air conditioning across all three facilities. The new chiller should offer superior efficiency, reliability, and redundancy capabilities to minimize downtime and ensure uninterrupted cooling. This scope of work includes all necessary mechanical, electrical, and structural modifications to complete the replacement, including concrete pad adjustments if required. DPW Project Number: 44538 Fort Moore Building Number: 36, 37, 38 Period of Performance: 390 Job Walk: TBD Proposal Due: TBD Bid Process: TBD The purpose of this project is to replace an existing 125-ton York air-cooled chiller with a new high redundancy chiller to provide enhanced reliability and redundancy for cooling three separate buildings. The existing chiller serves as a critical component of the HVAC system, and its failure would result in the loss of air conditioning across all three facilities. The new chiller should offer superior efficiency, reliability, and redundancy capabilities to minimize downtime and ensure uninterrupted cooling. This scope of work includes all necessary mechanical, electrical, and structural modifications to complete the replacement, including concrete pad adjustments if required. Objectives: 1. Remove the existing 125-ton York air-cooled chiller, size and install new high redundancy central chiller to supply buildings 36, 37, and 38. 2. Ensure high redundancy similar to the Trane model TCAA to prevent total cooling loss across three buildings in the event of equipment failure or maintenance. 1. New chiller shall have redundant control boards to prevent loss of more than 50% cooling capacity in the event of control board failure or maintenance. 2. New chiller shall have redundant circuits to prevent loss of more than 25% cooling capacity in the event of circuit failure or maintenance. 3. New chiller shall have isolation valves and power interlocks to allow for maintenance on individual circuits without shutdown of the entire chiller. 4. New chiller shall be configured to default "ON" if connection to the Building Management System is lost. 5. New chiller shall be configured to attempt automatic restart after power loss / power instability. 3. Perform all mechanical, electrical, and structural work necessary to support the chiller replacement. 4. Minimize disruption to building operations during the replacement process through coordination and temporary air conditioning. Mechanical Demo Work a. Isolate and remove existing 125-ton chiller from the HVAC system b. Disconnect all electrical power, control wiring, and mechanical piping from the chiller
Post-Bid
Military
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
September 24, 2025
To Be Determined, Fort Benning, GA
Related To This Project
Fort Benning, GA
Bid Date: Oct 15 2025
Fort Benning, GA
Bid Date: Aug 26 2025
Fort Benning, GA
Bid Date: Aug 28 2025
Fort Benning, GA
Bid Date: Sep 05 2025
Fort Benning, GA
Bid Date: Sep 08 2025
Fort Benning, GA
Bid Date: Oct 16 2025
Fort Benning, GA
Bid Date: Aug 19 2025
Fort Benning, GA
Bid Date: Aug 19 2025
Fort Benning, GA
Bid Date: Aug 18 2025
Fort Benning, GA
Bid Date: Aug 18 2025
Fort Benning, GA
Bid Date: Aug 25 2025
Fort Benning, GA
Bid Date: Aug 11 2025
Fort Benning, GA
Bid Date: Aug 06 2025
Fort Benning, GA
Bid Date: Aug 07 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.