BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Demolition, site work, paving, outdoor lighting, renovation and addition to a mixed-use development in Clarkson, Nebraska. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of the construction of an addition and renovations to Clarkson School. There are two bid alternates. In general, the project will consist of three additions. The Area A entry addition will be a single-story addition approximately 6,400 S.F. in size having a taller entry commons, entry canopy and administration offices. The Area B Elementary addition will be a two-story addition approximately 9,500 S.F. in size having classroom spaces and includes a storm shelter. The Area C high school addition will be a single-story addition approximately 13,000 S.F. in size and includes program areas such as classrooms, metals/wood shop, ag and FCS classrooms. The new additions total approximately 29,200 S.F. Work includes concrete, steel post and beam, metal studs, masonry backup, brick veneer, architectural precast walls, aluminum storefront and metal wall panels, EPDM Roofing, as well as architectural plastic laminate casework, hollow metal frames, wood and hollow metal doors, mechanical, fire suppression, electrical, fire alarm, audio visual and related improvements. The main renovation areas within the existing building are approximately 9,000 S.F. and include the renovation of interior spaces to accommodate mechanical and electrical improvements and to accommodate the new construction additions Work to include: Exterior work includes earthwork, new utility connections, stairs, railings, retaining walls, new sidewalks, site lighting and landscaping . Subcontractors interested in providing a proposal must submit a SEALED bid with BID SECURITY in the amount of 5% made payable to Clarkson Public School, either bid bond or cashiers check are acceptable We look forward to receipt of your proposal on bid day. If you should have any questions or require further assistance, please do not hesitate to contact Austin Larson of BD Construction at 308-234-1836. The Owner shall have the right to reject any or all bids and to reject a bid not accompanied by any requiring bid security or by other data required by the bidding documents; or to reject a bid which is in any way incomplete or irregular and to waive any informalities in any proposal.

Post-Bid

Educational

$300,000.00

Public - City

Addition, Demolition, Outdoor Lighting, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
93
Bidding Soon
937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 5, 2025

Project location map

Multiple Locations, Clarkson, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.