BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Site work for a water / sewer project in Flint, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000393785 Mott Community College (MCC) is seeking a qualified contractor to replace the watermain line on our main campus location in Flint. This is the line between Durham and Ballenger Field House. Question Deadline 08/02/2025 at 5:00 PM ET Questions are submitted online Yes should be submitted to the Procurement Ocer via email a minimum of four (4) days before the due date and time. Questions received after this deadline will be answered as time and circumstances permit. Kimberly Dolejsi 810.762.0203 Kimberly.dolejsi@mcc.edu General Requirements - Certified Payroll - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan - Spill Containment Plan - Warranty Information Required Award Requirements - All or None Award 1. Contractor must have and be able to demonstrate a minimum of five (5) of successful experience completing the same or similar projects and/or scopes of work. 2. Contractor will assign a competent project manager who has full authority to act for the Contractor and who will be MCC's primary point of contact and coordination during the execution of the project. 3. The watermain line between Durham Wellness Center and Ballenger Field House needs to be replaced, the scope of work for this project includes, but is not limited to: 3.1. Pre Construction 3.1.1. Site survey, utility coordination, trac management planning and notification; 3.2. Excavation and Trenching 3.2.1. Excavation of trenches for new watermain installation, including shorting and de-watering as required; 3.2.2. Disconnect from existing systems; 3.2.3. May require concrete cutting, boring and floor cutting; 3.2.4. Do NOT remove existing watermain; Abandonment of existing 4" watermain; 3.2.5. Install new watermain that must be the same as the existing currently in use; 3.2.6. Installation depth shall be deep enough that this does not freeze; no less than 52"; 3.3. Watermain Installation 3.3.1. Installation of new watermain pipes, fittings, valves, fire hydrants and service lines from Ballenger to Durham in accordance with specified materials and standards; 3.3.2. Ensure proper bedding, backfilling and compaction; 3.4. Connection to Existing Systems 3.4.1. Make necessary connections to existing watermain infrastructure, including tie-ins and cut-and-caps; 3.5. Testing and Disinfection 3.5.1. Pressure testing, leakage testing and disinfection of newly installed watermain lines per regulatory requirements including all local, state and federal regulations; 3.6. Service Line Transfer 3.6.1. Transfer existing water service connections from old mains to new mains; 3.7. Pavement Restoration 3.7.1. Restoration of all disturbed surfaces, including asphalt, concrete, sidewalks, curbs, landscaping, etc to their original or better condition; 3.8. Disposal of Materials 3.8.1. Proper and legal disposal of all excavated materials and old watermain components. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Award

Water / Sewer

$107,200.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
83
Bidding Soon
2,259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 1, 2025

Project location map

1401 E Court St, Flint, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.