BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and paving for a civil project in Flint, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Bridge rehabilitation including deep overlay with partial deck replacement, barrier replacement, shallow overlay, epoxy overlay, expansion joint replacement, concrete and steel beam repairs, substructure patching, deck replacement of 1 structure, guardrail and approach work on I-69 at 17 structures, Genesee and Shiawassee Counties. This project includes a 2 year concrete surface coating warranty and a 5 year high friction epoxy overlay performance warranty. This is an OJT VIP Project. Please see Special Provision for Preparation and Consideration of Bids on On-the-JobTraining Voluntary Incentive Program Projects. 0.00% DBE Participation Required Net classification required for this project is 35296 Fa Control Sec Job No Federal No BFPI 25042 208917A 25A0835 M 76023 218426A N/A Completion Date: 6/15/2028 MIDOT - 2509 003 - Bridge Rehabilitation Including Deep Overlay With Partial Deck Replacement The bidder has downloaded and examined the plans, specifications, special provisions, and related materials in the proposal, as well as the location of the work described in the proposal for this project, has obtained all addenda issued for this project, is fully informed as to the nature of the work and the conditions relating to its performance, and understands that the quantities shown are approximate only and are subject to either increase or decrease. 208917PE, US0023580.9475, 240-223466-1 The Project Area extends along I-69 from approximately one-half mile west of Elms Road to approximately one mile east of Bristol Road in Genesee County, Michigan. Project activities will occur at intermittent locations throughout the corridor. The project corridor is approximately 3.54 miles in length as shown on Figures 1 and 2 in Appendix A. Question Deadline 08/29/2025 All inquiries concerning the plans and proposal for this project are to be directed to: Katie Hoensheid MDOT-eProposal@Michigan.govAll inquiries must be made by E-mail through the electronic proposal system at MILogin for Third Party's MDOT e-Proposal application. Telephone inquiries will not be answered. To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting.

Award

Bridges / Tunnels

$33,352,986.00

Public - State/Provincial

Paving, Site Work

1610

10

41

10

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
102
Bidding Soon
2,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

March 30, 2026

Project location map

I-69, Flint, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.