Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work for a road / highway in South Jordan, Utah. Completed plans call for site work for a road / highway.
**As of August 21, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City is seeking a qualified contractor to perform park strip landscaping improvements on Redwood Road (SR-68) between 10400 S - 9400 S and 11400 S - 10400 S, and also on 11400 S between 3600 W - Redwood Road and Redwood Road - 600 West. The work generally includes the excavation of existing park strips, relocation of existing irrigation controller to new location, installation and connection of new electric meter and strongbox enclosure for relocated irrigation controller, relocating and replacing existing valve to new location, replacing existing irrigation valves for drip irrigation, install new irrigation system to park strip reconfiguration of existing irrigation system laterals to accommodate new drip irrigation for park strips, installation of master valves and control wiring on existing irrigation systems, installation of plantings, installation of weed fabric and rock mulch. All Labor, Supplies, Tools, Equipment, Parts, Permits, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Mobilization and all other Costs including Overhead and Profit are to be included in bid line items. Questions Due Date: Jul 28th 2025, 12:00 PM MDT The work must be substantially complete by June 15, 2025. All work, excluding planting, should be substantially complete by November 4th, 2025. If CONTRACTOR is unable to make planting window, then CONTRACTOR receives permission to return to location and plant between May 15th, 2026 - August 30th, 2026. The City anticipates that a Notice to Proceed will be given on the following date, but reserves the right to change such date: Anticipated date of Notice to Proceed: August 4th, 2025 The City reserves the right to reject any Bid if the City believes that it would not be in the best interest of the project or the City. Without limitation, such rejection may be because the Bid is not responsive, or the Bidder is unqualified or of doubtful ability or the Bid or Bidder fails to meet any other pertinent standard or criteria established by the City, as solely determined by City. Custom bid result Schedule A: Redwood Rd Park Strip Arrow Landscaping- $440,086 Schedule B: 11400 S Park Strip Utah Landscape Construction. $653,131
Award
Roads / Highways
$1,093,217.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 12, 2025
Redwood Rd, South Jordan, UT
Related To This Project
South Jordan, UT
Bid Date: Aug 11 2025
South Jordan, UT
--
South Jordan, UT
Bid Date: Sep 09 2025
South Jordan, UT
Bid Date: Oct 15 2025
South Jordan, UT
Bid Date: Oct 24 2025
South Jordan, UT
Bid Date: Oct 15 2025
South Jordan, UT
Bid Date: Oct 16 2025
South Jordan, UT
--
South Jordan, UT
--
South Jordan, UT
Bid Date: Jun 24 2025
South Jordan, UT
Bid Date: May 13 2025
South Jordan, UT
--
South Jordan, UT
--
South Jordan, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
