BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and paving for a mixed-use development in Highland Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Park District of Highland Park is seeking sealed bids for the following scope of work: Asphalt Removal and Replacement of Chantilly pedestrian walk at Larry Fink Park, basketball court at Fontana-Pasquesi Park, Augusta Way pedestrian walk at the Preserve, and the boat parking lot at Park Avenue Boating Facility (Highland Park, IL). The scope of work includes all necessary workmanship to satisfactorily complete the work as required by the contract documents. Work will start on Monday, September 15, 2025, and conclude by Friday, October 24, 2025. Contractors bidding on the project must have a minimum of 5 years of experience in the work or similar. Questions regarding this bid should be directed to Ben Kutscheid at 847.579.3104 or bkutscheid@pdhp.org. Construction Start: 09/15/2025 o Anticipated Project Completion: 10/24/2025 The Park Board of the Park District of Highland Park reserves the right to reject any or all bids in full or in part, if it shall deem it in the public interest to do so. In submitting a bid, Contractor acknowledges that Contractor must comply with all requirements of the Illinois Prevailing Wage Act and all other applicable Illinois laws. PARK DISTRICT OF HIGHLAND PARK /s/ Brian Romes Secretary of the Board of Park Commissioners. The bid includes Base Bid scope at: Larry Fink Park, 1377 Clavey Road, Highland Park, Illinois Removal and Replacement of specified Pedestrian Walk Fontana-Pasquesi Park, 1780 Eastwood Avenue, Highland Park, Illinois Removal and Replacement of basketball court The Preserve, 1201 Park Avenue West, Highland Park, Illinois Removal and Replacement of Pedestrian Walk Park Avenue Boating Facility, 8 Park Avenue, Highland Park, Illinois Removal and Replacement of Boat Parking Lot SCHEDULE OF WORK Contractor shall commence work on Monday, September 15, 2025, and work shall be completed by Friday, October 24, 2025 The Owner shall pre-approve start date of project. Work shall be completed in accordance with the following site schedule: Invitation for Bid Release Thursday, July 24,2025 Sealed Bids Due No Later Than 9:00 am Friday, August 8, 2025 Anticipated Contract Award Wednesday, August 27, 2025 Construction Start Monday, September 15, 2025 Construction Start (Park Ave Lot) Monday, October 20, 2025 Project Completion Friday, October 24, 2025 Project Completion (Park Ave Lot) Friday, November 7, 2025 File No. 28583

Bid Results

Roads / Highways

$165,000.00

Public - City

Paving, Site Work

17

14

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
283
Bidding Soon
3,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

September 15, 2025

Project location map

Multiple Locations, Highland Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.