BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2025 at 8:00 PM

Updated August 24, 2025

Site work and paving for a road / highway in Hutchinson, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.0" Mill and 1.5" Overlay (SR12.5A) (PG 64-28). Multi-Component Pavement Marking, and Rock Edge Wedge. This project is tied to 14-48 in Kingman Co. The contractor is responsible for establishing and maintaining centerline ofthe traveled way for the duration ofthe project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract. No lane closures or detours will be allowed overnight. No work will be allowed between September 5th through September 14th due to the Kansas State Fair. The Contractor must mill and inlay any section of the roadway on the same day. No traffic will be allowed on the surface, and the contractor must have a contingency plan in case of bad weather and/or equipment breakdown. The Bid Item for pavement marking removal is for removal of existing edge line and center line pavement marking on the Ninnescah River bridge Sta 644+47. Milling and Hma Overlay. K-14; Fr Rn/km Cl N to K96/k14 Jct in Reno Co. Lgth 16.656 Mi. Tied to Ka 7769-01. Project Number: K014-078 KA 7768-01 County: Reno Project Work Description: Milling and Hma Overlay Working Days: 35 Restricted Days (35) Total Contract Days (45) Latest Starting Date: September 07, 2026 Questions or Comments may be sent to: Shane HouserShane.Houser@ks.gov (785) 296-7183 The cutoff time for asking questions will be noon on the Monday before the Letting. All questions will be answered and all addendums should be sent no later than noon on the Tuesday before the letting. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas KSDOT - 257 - Milling and HMA Overlay - K-14

Bid Results

Roads / Highways

$2,706,618.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
36
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 7, 2026

Project location map

KS-14, Hutchinson, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.