BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated October 14, 2025

Site work for a playground / park / athletic field in Dearborn, Michigan. Working plans call for site work for a playground / park / athletic field.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Reference Number 0000393898 Proposals are being solicited for the purpose of contracting for the demo, designing, furnishing and installation of playground equipment at Argyle Williamson Park. Question Deadline 08/08/2025 at 1:00 PM ET Questions are submitted online No, Purchasing Contact: Jay Andrews, Senior Buyer Email: jandrews@dearborn.gov Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required - Prevailing Wage Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all proposals, or to accept or reject any proposal in part, and to waive any minor informality or irregularity in proposals received if it is determined by the Purchasing Agent that the best interest of the City will be served by doing so. Through this Request for Proposal (RFP), the City of Dearborn hereby invites businesses that meet the qualifications set forth herein to submit proposals to provide the demo, design, furnishing and installation of playground equipment at Argyle Williamson Park located within the City of Dearborn. Argyle Williamson Park is a "community park" located in a residential area of east Dearborn. (See attached map.) 2. GENERAL INFORMATION: The City of Dearborn is looking to renovate several local parks with a portion of its Community Development Block Grant (CDBG) funding. The City of Dearborn is requesting proposals from qualified vendors to design, furnish, and install playground equipment at Argyle Williamson Park. The purpose of this RFP is to provide interested vendors with sufficient information to facilitate preparation and submission of a proposal that would provide playground equipment that is safe, accessible to children with disabilities, and of high quality at the best value to the City. An on-site visitation is mandatory. Since time is of the essence, the City of Dearborn places a great amount of emphasis on minimizing the installation time. It is the City's intent to have all equipment ready for complete use by end of December, 2025. Due to the use of CDBG funding the awarded contractor must follow all federal requirements and SAM.gov registration per the attached documents. 1. Federal Compliance Requirements 2. Davis Bacon Info to Contractors 3. Davis Bacon and Related Acts 4. Sam.gov Contractors information sheet 5. 2025 bid addendum HUD section 3 3. SCOPE OF WORK: The successful Respondent (Contractor) shall be required to provide all labor, equipment, materials, and supplies to accomplish the following work except as otherwise identified below. Playground Area and Equipment: * Demo and dispose of the existing playground and swing structures * The playground area should measure at least 50x70 feet. 60' x 80' is also acceptable. * The play structure must be suitable for children aged 2-12 years. * Please include four 6' benches. Two should have backs, two should be without backs. * A bank of swings with at least five swings is required, specifically two belt swings, two tot swings, and one adaptive swing. * Poured-in-place (PIP) surfacing is required for the entire area. Installation Details: * Installation should encompass demolition, excavation, hauling, disposal and the erection of a 6-foot temporary chain-link fence for construction. * It also includes the installation of the equipment, a 1-foot by 6-inch steel-reinforced concrete border, replacement of five sections of concrete sidewalk, a stone base for the PIP surfacing, and site restoration. * The installation team must be certified by the manufacturer. * PIP surfacing should feature an aliphatic binder with a 50/50 color/black mix. Additional Requirements: * Please include a PLM Bond. 100% Payment and Performance bonds are required. * Please factor in possible City of Dearborn building permits. * The bidder must provide five references for structures over 20 years old that they have serviced for parts and maintenance within the last two years

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Site Work

5

5

4

4

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
524
Active Projects
300
Bidding Soon
2,803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

December 15, 2025

Project location map

Williamson St, Dearborn, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.